BLD-Final | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Aging Inspection | 4/6/2015 | 4/6/2015 | 4/6/2015 | | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PART |
Mike Jordan
|
|
|
Tyler Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning and public works signs perm.
|
BLD-Final | 12/15/2014 | 12/15/2014 | 12/15/2014 | P | NR |
Mike Jordan
|
|
|
|
BLD-Final | 12/1/2014 | 12/2/2014 | 12/2/2014 | P | NR |
Mike Jordan
|
|
|
tyler Phone #: ###-####
|
FIRE-Final Inspection | 12/1/2014 | 12/2/2014 | 12/2/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 11/21/2014 | 11/24/2014 | 11/24/2014 | A | NR |
Mike Jordan
|
|
|
Tyler Phone #: ###-####. Needs fire/life/safety finals.
|
FIRE-Final Inspection | 11/21/2014 | 11/21/2014 | 11/21/2014 | P | CANC |
Troy Cobbley
|
|
|
Left voice messag on Tyler's phone that fire alarm and fire sprinkler permits have not been inspected/finaled yet and are needed prior to a fire life safety final.
|
BLD-Framing/Rough-in | 10/2/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Jim Sly
|
|
|
Richard Phone #: ###-####
|
BLD-Energy code compliance | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Jim Sly
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | FAIL |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Complete all draft stops in attic areas, repair the drholes in draft stop attic areas, complete all lateral bracing,Provide H2.5 on trusses at interior bearing walls at 2nd floor. Fireblock all furdowns, remove foam insulation from partwall penetrations and fire caulk. A tenting inspection for fire sprinklers is also required prior to energy code inspection. ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####. floor to floor straps.
|
BLD-Wall Bracing | 8/25/2014 | 8/26/2014 | 8/26/2014 | A | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####. 2nd. floor interior shear walls ok.
|
BLD-Wall Bracing | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####. remainder of 2nd. floor exterior shear walls ok.
|
BLD-Wall Bracing | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####. 2nd. floor exterior shear walls ok.
|
BLD-Wall Bracing | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | PASS |
Phil Shearer
|
|
|
Richard Phone #: ###-#### 1st floor exterior shear walls OK. 2nd floor straping west side only OK
|
BLD-Wall Bracing | 8/20/2014 | 8/20/2014 | 8/20/2014 | P | PASS |
Phil Shearer
|
|
|
Richard Phone #: ###-#### Interior shear walls OK
|
BLD-Wall Bracing | 8/18/2014 | 8/19/2014 | 8/19/2014 | P | PASS |
Mike Jordan
|
|
|
richard Phone #: ###-####
|
BLD-Footing | 7/30/2014 | 7/30/2014 | 7/30/2014 | P | PASS |
Phil Shearer
|
|
|
Interior footings
|
BLD-Footing | 7/29/2014 | 7/30/2014 | 7/30/2014 | A | CANC |
Jim Sly
|
|
|
Ken--around 11 please Phone #: ###-#### Canc By Contr.
|
BLD-Energy code compliance | 7/25/2014 | 7/25/2014 | 7/25/2014 | P | PASS |
Mike Jordan
|
|
|
Ashley Phone #: ###-####. rigid foam at stemwall under slab on grade.
|
BLD-Footing | 7/22/2014 | 7/23/2014 | 7/23/2014 | A | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|