BLD-Final | 10/15/2014 | 10/16/2014 | 10/17/2014 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety final approved.
|
BLD-Aging Inspection | 9/2/2014 | 9/2/2014 | 9/2/2014 | | PEND |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | PART |
Forrest France
|
|
|
Fire life safety inspection and evaluation at the kitchen and bakery areas completed. Items noted include; missing EM light at the exit discharge, post 2A10BC PFE, need to schedule fire alarm testing for occupant notification. As-builts for fire sprinkler modifications accepted. Request for temporary occupancy must be approved by fire prevention chief R. Gervais.
|
BLD-Final | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | PART |
Dave Hannah
|
|
|
for temp CO // Jim Phone #: ###-#### ok for temp occ needs all other trades to go perm occ
|
BLD-Final | 6/27/2014 | 6/30/2014 | 6/30/2014 | A | NR |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | DONE |
Jim Storey
|
|
|
Jim Phone #: ###-#### previous aproval 425
|
BLD-Ceiling Grid Inspection | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2014 | 5/7/2014 | 5/8/2014 | P | PASS |
Dave Hannah
|
|
|
jim - cover inspection Phone #: ###-####
|
BLD-Other | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | NR |
Dave Hannah
|
|
|
jim - cover inspection Phone #: ###-####
|