BLD-Final | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Mike Jordan
|
|
|
or ###-#### Scott Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PART |
Troy Cobbley
|
|
|
Life safety in phase 2 and 3 passed.
|
BLD-Framing/Rough-in | 6/12/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Mike Jordan
|
|
|
Ceiling cover inspection-Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Interior steel stud walls only ok, phase 2.
|
BLD-Final | 5/15/2014 | 5/16/2014 | 5/16/2014 | A | PART |
Mike Jordan
|
|
|
. ok to occupy east portion of tje tenant improvement while the existing portion is being remodeled.
|
FIRE-Final Inspection | 5/15/2014 | 5/16/2014 | 5/16/2014 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for Phase I location where life safety is complete. Panic hardware is to be installed on front door per the door schedule prior to final sign off of whole project. Scott #: ###-####
|
BLD-Final | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | NR |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | CANC |
Troy Cobbley
|
|
|
Cancel per scott Phone #: ###-####
|
BLD-Final | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | CANC |
Mike Jordan
|
|
|
scott Phone #: ###-####. Moved to pm.
|
FIRE-Conference | 5/14/2014 | 5/14/2014 | 5/14/2014 | P | DONE |
Troy Cobbley
|
|
|
Went over life safety requirements with Scott. I agreed that since the doors are not here yet if case work was installed I would be ok with a pass on life safety in this phase of work.
|
BLD-Final | 5/13/2014 | 5/14/2014 | 5/14/2014 | P | CANC |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/14/2014 | 5/14/2014 | 5/14/2014 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 4/24/2014 | 4/25/2014 | 4/25/2014 | P | PASS |
Mike Jordan
|
|
|
scott Phone #: ###-####. Interior steel stud walls, no grid at phase 1 (1500s.f. addition into adjacent tenant space).
|