Permit Information
Permit NumberBLD14-00490
StatusFinaled
Name STRUCTRUAL INTEGRITY
Site Address 416 S 9TH ST Unit: 106
Project NameThe Knitting Factory Mezzanine
Customer Number 
ePlanReviewNo
Description
(THE KNITTING FACTORY - MEZZANINE ADDITION) Fire sprinklers used for story and area increases. To expand the existing 1,712 square foot mezzanine by 180 square feet to a total area of 1,892 square feet. Work is to include a floor system constructed of steel beams, wood joists, 1-1/8” structural floor sheathing, and threaded rods and clevises. A 4 riser stairway with handrails and 42 inch high guards will also be constructed. Special inspection is required for welding and bolting. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The total occupant load of this tenant space is not allowed to exceed 999 or the occupant load established by previously approved occupancy scenarios. The maximum occupant load of the mezzanine shall be maintained at 192. The existing exit signs and emergency light fixtures are required to be maintained. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference7/1/20147/1/20147/1/2014APASS
DetailsDave Hannah
DOC - Permit Finaled7/1/20147/1/20147/1/2014APASS
DetailsDave Hannah
BLD-Final4/11/20144/11/20144/11/2014PPASS
DetailsDave Hannah
Please call to coordinate inspection time. Final fire inspection scheduled for today as well.

Thanks, Phone #: ###-#### >> Inspection requested via web by Chris Palmer
FIRE-Final Inspection4/11/20144/11/20144/11/2014PPASS
DetailsTroy Cobbley
Life safety passed. It appears the115cd fire alarm strobe on the north wall will provide coverage for this new area.
BLD-Framing/Rough-in4/4/20144/4/20144/6/2014PPASS
DetailsDave Hannah
New balcony joist framing above existing lower bar. Drawings are on the bar top. Please call with any questions. Thank You. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Framing/Rough-in4/3/20144/4/20144/4/2014ACANC
DetailsDave Hannah
Joist framing at new sound control booth. Plans and permit located on bar top. Phone #: ###-#### >> Inspection requested via web by Chris Palmer Inspection cancelled from web by: Chris Palmer