BLD-Final | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per tim frost sprinkler protection not required under the tanks and distillery.
|
BLD-Conference | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | DONE |
Mike Jordan
|
|
|
Tenant needs a final or temp CO (requires permit change for either retail occupancy only or current scope of permit). Spoke to owner, (Mike) noted that A1 will complete the plumbing and install the hood this wednesday 11-18-15. Trying for final inspections this friday and monday.
|
BLD-Conference | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | DONE |
Mike Jordan
|
|
|
Check status of distillery. Brewing?. Not brewing at this time. Per owner, all remaing parts have arived. A1 will be obtaining a mech. permit to install the hood.
|
BLD-Final | 5/20/2015 | 5/21/2015 | 5/21/2015 | P | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Temp occ. ok for the front sales portion only
|
FIRE-Final Inspection | 5/20/2015 | 5/21/2015 | 5/21/2015 | A | PART |
Troy Cobbley
|
|
|
The life safety in the "M" occupancy area of this project is passed. No distilling or "manufacturing" allowed at this time. I went over the life safety requirements as noted on the Fire Dept Plan Review Comments.
|
BLD-Conference | 5/19/2015 | 5/20/2015 | 5/20/2015 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 5/20/2015 | 5/20/2015 | 5/20/2015 | A | DONE |
Mike Jordan
|
|
|
A correction notice was issued to schedule all required inspections to obtain a cert. of occupancy.
|