BLD-Final | 9/16/2014 | 9/16/2014 | 9/17/2014 | P | PASS |
Dave Hannah
|
|
|
Duel Phone #: ###-####
|
FIRE-Final Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 | P | PASS |
Forrest France
|
|
|
Verified noted correction items. Contractor to include EM lighting inside the exit stairway at the SE.
|
BLD-Final | 7/15/2014 | 7/17/2014 | 7/17/2014 | P | PART |
Bob Archibald
|
|
|
inspection for temp CO // Jim (or Patrick ###-####) Phone #: ###-####. ok for temp occupancy, CN issued- need exterior handrail south exit, panic hardware west door and permanant exit signs.
|
FIRE-Final Inspection | 7/16/2014 | 7/17/2014 | 7/17/2014 | A | PART |
Craig D. Hanson
|
|
|
Temp CO good for 2 weeks (ending 7/31) for delivery and instilation of new exit signs. Temp exit signage good. All emergency lighting tested.
|
FIRE-Final Inspection | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | CANC |
Craig D. Hanson
|
|
|
Not a final inspection. This was a pre-final walk thru. exit signs and emergency lighting yet to be installed.
|
FIRE-Conference | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | DONE |
|
|
|
Pre-final walk through. No temp CO. Exit signage and emergency lighting not installed.
|