BLD-Final | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Dave Hannah
|
|
|
Darren Phone #: ###-#### as per city aproved plans note handrails on ext stairs are not to todays codes and not on plans to be changed.
|
FIRE-Final Inspection | 6/13/2014 | 6/16/2014 | 6/16/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
FIRE-Conference | 6/10/2014 | 6/10/2014 | 6/10/2014 | P | DONE |
Forrest France
|
|
|
Regarding fire life safety items and project schedule.
|
FIRE-Conference | 5/6/2014 | 5/8/2014 | 5/8/2014 | A | DONE |
Forrest France
|
|
|
On site conference regarding hood suppression permit work and equipment layout.
|
BLD-Framing/Rough-in | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | PASS |
Dave Hannah
|
|
|
darren Phone #: ###-####
|
FIRE-Conference | 5/1/2014 | 5/2/2014 | 5/2/2014 | A | DONE |
Forrest France
|
|
|
On site conference with contractor regarding hood suppression system, EM lighting, exit signs, rated stairway, door hardware, fire life safety conditions and project schedule.
|
BLD-Framing/Rough-in | 5/1/2014 | 5/2/2014 | 5/2/2014 | A | PASS |
Dave Hannah
|
|
|
darren Phone #: ###-####
|
BLD-Conference | 4/30/2014 | 5/1/2014 | 5/1/2014 | A | DONE |
Mike Jordan
|
|
|
darrin Phone #: ###-####. Spoke to contractor about concerns for a draft stop in ceiling. One is already present, but concealed area is less than 3000 s.f.
|