Red Rock Christian Church - Multi-Use Assembly Area and Storage Area Addition - To construct an 1,850 square foot, one story multi-use space addition on the northeast corner of the building and a 1,230 square foot, one story storage room addition on the southeast corner of the existing building. The additions are constructed of masonry exterior walls and wood framed and trussed roof construction. This permit also includes some restrooms and office area remodel, as well as, related site improvements. This building will be fully fire sprinklered. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other12/8/201412/8/201412/8/2014PCANC
DetailsPhil Shearer
Erosion Control Program Final inspection. Building and site work are complete. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Final12/5/201412/8/201412/8/2014APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Markus Schlegel
FIRE-Final Inspection12/4/201412/5/201412/5/2014PPASS
DetailsForrest France
Fire life safety inspection completed satisfactory. Two non-functional exit signs to be repaired and one EM light to be added per discussion prior to structural final.
BLD-Final12/2/201412/4/201412/4/2014ACANC
DetailsPhil Shearer
Structural and final. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Final11/20/201411/20/201411/20/2014PNR
DetailsJim Sly
Completion Inspection on remodeled rooms #123,126,128,114,115,116,117,118,101,119,129,133,134,135,136 ; 137
Ceiling Grid inspection in Room #120, 121, 122 Phone #: ###-####
Inspection requested via web by Markus Schlegel

Contractor wants to allow church members to use Kitchen, some class rooms and restooms completed prior to final inspection. Advised to have conference with Fire Inspector.
BLD-Framing/Rough-in10/7/201410/8/201410/8/2014PPASS
DetailsPhil Shearer
South Storage room addition, would prefer later in the day around 2pm. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in10/6/201410/6/201410/6/2014PPART
DetailsPhil Shearer
North addition steel stud framing and south addition wood framing. Early afternoon preferred. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in9/29/20149/30/20149/30/2014APASS
DetailsPhil Shearer
Truss and roof framing and sheeting on north addition multi use rooms Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Other9/23/20149/23/20149/23/2014PPART
DetailsPhil Shearer
ESC Site Inspection ESC#14-00175 Last performed by Andy Long 7/15/14. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Other9/18/20149/19/20149/19/2014PPASS
DetailsPhil Shearer
CMU Rebar and grouting inspection. Grouting to take place at 2pm. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Other9/12/20149/15/20149/15/2014APASS
DetailsPhil Shearer
Rebar and Grout inspection, north CMU walls. Grout time is 8am. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Other9/10/20149/12/20149/12/2014APASS
DetailsPhil Shearer
CMU Rebar and Grout inspection. Grout at 8am. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Other9/8/20149/10/20149/10/2014A****
DetailsPhil Shearer
*****pour time 10:00AM*****Masonry rebar & grout inspection second course, grouting will take on will call and TBD for AM grouting. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in9/9/20149/9/20149/9/2014PPASS
DetailsPhil Shearer
ADA restrooms
BLD-Framing/Rough-in9/9/20149/9/20149/9/2014ANR
DetailsPhil Shearer
Framing inspection in the mechanical/pantry room can be do the same time as grout and rebar for masonry at 11am. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Other9/8/20149/9/20149/9/2014APASS
DetailsPhil Shearer
Masonry rebar ; grout inspection second course, grouting will take place at 11am. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Conference9/5/20149/8/20149/8/2014APASS
DetailsPhil Shearer
inspection will include 1st course of masonry and rebar on the north and south addition prior to grouting. Grouting is scheduled for 7am pending inspection. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Foundation8/19/20148/20/20148/20/2014PPASS
DetailsPhil Shearer
rebar and stem wall inspection Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Foundation8/19/20148/19/20148/19/2014PPASS
DetailsPhil Shearer
Footing and rebar inspection on north and south foundation additions. Phone #: ###-#### Inspection requested via web by Markus Schlegel Footings
BLD-Conference7/15/20147/16/20147/16/2014PPASS
DetailsJim Storey
Marcus-would like a call with an approx meet time Phone #: ###-####