Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00593
StatusFinaled
Name CAPITAL CITY BUILDING COMPANY LLC
Site Address 2809 W HILLWAY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
***4-16-2014 THIS PROJECT IS MODIFIED TO REFLECT THE EXPANSION OF THE GARAGE AREA BY 172S.F. NO ADDED VALUE TO THIS PROJECT. 4-16-2014 pep*** This project is for the remodel and addition to an existing 2506s.f. 2-story single family dwelling. the addition will include 422s.f. of basement area and a new stair to the basement. The main level addition will include 1327s.f. to the entire back of the dwelling that will create a new master suite, kitchen dining area and one bedroom aditions. The garage will be enlarged from 456s.f. to 800s.f. with 360s.f. of bonus storage above it. R-1B ok per Leon Letsen. Separate electrical, plumbing, mechanical and ESc permits are required. All per the approved plans as marked, energy prescriptive method, engineer's details and calculations along with the plan review notes pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/19/201411/19/201411/20/2014PPASS
DetailsTony Young
Aaron Phone #: ###-####
DOC - Permit Finaled11/20/201411/20/201411/20/2014PPASS
DetailsTony Young
done
BLD-Ceiling Grid Inspection11/18/201411/19/201411/19/2014ACANC
DetailsTony Young
Aaron Phone #: ###-####
BLD-Final11/17/201411/18/201411/18/2014PCANC
DetailsTony Young
aaron Phone #: ###-####
BLD-Final10/27/201410/28/201410/28/2014AFAIL
DetailsJim Sly
Aaron Megee Phone #: ###-####
Handrail not continuous.
BLD-Energy code compliance6/26/20146/27/20146/27/2014APASS
DetailsTony Young
Aaron Phone #: ###-####
BLD-Other6/26/20146/26/20146/27/2014PNR
DetailsTony Young
David Phone #: ###-####
BLD-Framing/Rough-in6/20/20146/23/20146/23/2014APART
DetailsTony Young
Aaron Phone #: ###-####,, ok to insulate
BLD-Framing/Rough-in6/20/20146/20/20146/20/2014PPART
DetailsTony Young
Aaron Phone #: ###-####,, ok to insulate,, need to verify seal pack,, need soffit inspection
BLD-Wall Bracing6/10/20146/11/20146/11/2014APASS
DetailsTony Young
aaron Phone #: ###-####
BLD-Foundation4/18/20144/21/20144/21/2014APART
DetailsTony Young
Shawn Phone #: ###-####,, work in progress,, ok
BLD-Footing4/16/20144/17/20144/17/2014APASS
DetailsTony Young
Pouring at 12 - Shawn Phone #: ###-####
BLD-Conference4/10/20144/10/20144/10/2014PPEND
DetailsTony Young
Aaron Phone #: ###-####,, ?s on tall wall.. will call in when working on it