BLD-Final | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | PASS |
Jim Sly
|
|
|
Please call about 30min to an hour for access - Steve Phone #: ###-####
|
DOC - Permit Finaled | 10/14/2015 | 10/14/2015 | 10/14/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/14/2014 | 7/15/2014 | 7/15/2014 | A | NR |
Jim Sly
|
|
|
Joe Phone #: ###-#### Need Electr and Mech finals.
|
BLD-Wall cover | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-#### Energy code pass
|
BLD-Framing/Rough-in | 5/12/2014 | 5/13/2014 | 5/13/2014 | A | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-#### and energy code inspection also please
|
BLD-Conference | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | DONE |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
BLD-Footing | 3/28/2014 | 3/28/2014 | 3/28/2014 | P | PASS |
Mike Jordan
|
|
|
Joe or ###-#### Steve-Please call at least 30 mins prior to inspection Phone #: ###-####
|