BLD-Final | 11/4/2014 | 11/5/2014 | 11/5/2014 | P | PEND |
Dave Hannah
|
|
|
Jeremy Phone #: ###-#### ok for temp occ needs other trades to go perm and install ada hand rails and add ext on gaurd rail
|
FIRE-Final Inspection | 10/31/2014 | 11/3/2014 | 11/3/2014 | P | PASS |
Forrest France
|
|
|
Previous correction items are finished with the exception of building address numbers, new EM light at the restroom hallway needs repaired. Items to be completed prior to structural final as discussed. Note: *no signature card available on site at the time of inspection.
|
BLD-Final | 10/30/2014 | 10/31/2014 | 10/31/2014 | P | NR |
Tony Young
|
|
|
walk through only - Jeremy Phone #: ###-####,, need rail up
|
FIRE-Final Inspection | 10/30/2014 | 10/31/2014 | 10/31/2014 | P | PART |
Craig D. Hanson
|
|
|
1.Exit sign on main door needs to be installed. 2. bug eyes need added in back hallway by restrooms 3. verbal verification of smoke detector in HVAC units working.
|
BLD-Ceiling Grid Inspection | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/29/2014 | 10/29/2014 | 10/29/2014 | P | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
FIRE-Final Inspection | 10/23/2014 | 10/24/2014 | 10/24/2014 | P | DONE |
Forrest France
|
|
|
Inspection request intended for an on site conference regarding fire life safety conditions and requirements. Discussed door hardware, fire extinguishers, exit signs and EM lights, HVAC duct SD, premise identification, approved plan set, review notes, etc.
|
BLD-Energy code compliance | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####,, all mechanical will be left open,, ok to cover walls
|
BLD-Energy code compliance | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | CANC |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Energy code compliance | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | PART |
Tony Young
|
|
|
Jeremy Phone #: ###-####,, work in progress,, ok so far
|
BLD-Framing/Rough-in | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PART |
Tony Young
|
|
|
Jeremy Phone #: ###-####,, ok to insulate and one side the walls
|
BLD-Framing/Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | NR |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | NR |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/2/2014 | 9/3/2014 | 9/3/2014 | P | NR |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Footing | 8/25/2014 | 8/26/2014 | 8/26/2014 | A | PASS |
Dave Hannah
|
|
|
Jeremy Phone #: ###-####
|
BLD-Concrete | 5/29/2014 | 5/29/2014 | 5/29/2014 | P | PART |
Tony Young
|
|
|
Jeremy Phone #: ###-####,, interior ftgs,, rebar to be added to "f-1" footings
|