Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00811
StatusFinaled
Name W R GANN COMPANY LLC
Site Address 533 W PASO FINO DR
Project NameHon Residence
Customer Number 
ePlanReviewYes
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 3593 sq. ft., two story (first story 2600 sq. ft., second story 993 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 495 sq. ft. of covered patio/porch and a 797 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/201412/5/201412/5/2014PPASS
DetailsTony Young
Walt Phone #: ###-#### Or Mike ###-####
DOC - Permit Finaled12/5/201412/5/201412/5/2014PPASS
DetailsTony Young
c of o issued
BLD-Energy code compliance7/31/20148/1/20148/1/2014PPASS
DetailsTony Young
Mike Phone #: ###-####
BLD-Framing/Rough-in7/24/20147/25/20147/25/2014PPART
DetailsTony Young
Mike Phone #: ###-####,, ok to insulate pend mech pass in system on f/p,, ok to do seal layer for air seal
BLD-Conference7/16/20147/16/20147/16/2014PPASS
DetailsTony Young
BLD-Conference7/15/20147/16/20147/16/2014APASS
DetailsTony Young
Mike Phone #: ###-####,, with framer
BLD-Conference7/10/20147/11/20147/11/2014PPASS
DetailsTony Young
Mike Phone #: ###-#### frame ?s,, seal pack will be done w/ foam blow in,, need trades
BLD-Wall Bracing6/17/20146/17/20146/17/2014PPASS
DetailsTony Young
Mike Phone #: ###-####
BLD-Wall Bracing6/16/20146/17/20146/17/2014ANR
DetailsTony Young
Mike Phone #: ###-####
BLD-Foundation5/7/20145/7/20145/7/2014PPASS
DetailsTony Young
Robert Phone #: ###-####
BLD-Footing5/5/20145/5/20145/5/2014PPART
DetailsTony Young
Robert Phone #: ###-####,, work in progress,, ok to pour when ready