Permit Information
Permit NumberBLD14-00838
StatusFinaled
Name JIM NYHOF DESIGNER BUILDER LLC
Site Address 541 W PASO FINO DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2,933 sq. ft., two story (first story 2,392 sq. ft., second story 542 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 200 sq. ft. of covered patio/porch and a 1,083 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/1/201410/2/201410/2/2014PPASS
DetailsTony Young
Please call 30mins ahead for access - Brian Phone #: ###-####
DOC - Permit Finaled10/2/201410/2/201410/2/2014PPASS
DetailsTony Young
c of o issued. A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final10/1/201410/1/201410/1/2014PPEND
DetailsTony Young
Please call 30min ahead for walk through - Bryan Phone #: ###-####
BLD-Final9/29/201410/1/201410/1/2014APEND
DetailsTony Young
Please call 30min ahead for walk through - Bryan Phone #: ###-####,, walk through only,, need hillside,, blower door test, fire caulk seal garage
BLD-Wall cover7/24/20147/25/20147/25/2014APASS
DetailsTony Young
interior shear
BLD-Conference7/23/20147/23/20147/23/2014PPASS
DetailsTony Young
soffit vents - installed per supplied information
BLD-Energy code compliance7/18/20147/21/20147/21/2014APASS
DetailsTony Young
Brian Phone #: ###-####
BLD-Energy code compliance7/17/20147/18/20147/18/2014APART
DetailsTony Young
Brian Phone #: ###-####,, need insulation under upper deck area, above living area, other areas ok to cover
BLD-Framing/Rough-in7/17/20147/17/20147/17/2014PPART
DetailsTony Young
Late afternoon-Brian Phone #: ###-####,, still need soffits
BLD-Framing/Rough-in7/16/20147/17/20147/17/2014APART
DetailsTony Young
Late afternoon-Brian Phone #: ###-####
BLD-Framing/Rough-in7/15/20147/16/20147/16/2014PPART
DetailsTony Young
Late afternoon-Brian Phone #: ###-####,, frame corrections in progress,, ok to insulate,, need sprinklers passed fully
BLD-Framing/Rough-in7/15/20147/16/20147/16/2014APART
DetailsTony Young
Call ahead for access - Ryan Phone #: ###-####,, conf only
BLD-Framing/Rough-in7/14/20147/15/20147/15/2014APART
DetailsTony Young
Call ahead for access - Ryan Phone #: ###-####,, walk through w/ builder,, c/n on 2nd plans
BLD-Framing/Rough-in7/11/20147/14/20147/14/2014PNR
DetailsTony Young
Call ahead for access - Ryan Phone #: ###-####,, needs sprinklers 1st
BLD-Foundation5/21/20145/22/20145/22/2014PPART
DetailsTony Young
Ron Phone #: ###-####,, wip,, ok
BLD-Footing5/20/20145/21/20145/21/2014APASS
DetailsTony Young
Ron Phone #: ###-####