Description
(SAGE INTERNATIONAL SCHOOL – Phase I) This project is to convert an existing covered mall building (Parkcenter Mall) into a new school. The building is fire sprinklered for area increase. Under Phase I 30,0000 square feet of the Northern part of the building will be built out with classrooms / cafeteria / administration area. Work is to include: [structural upgrades including: new wood sheer walls, new wood hold-downs, new drag sheer blocking and strapping, new wood headers, and concrete repairs], exterior site improvements, [construction of interior non-bearing walls to create 24 classrooms, 3 offices, 2 core restrooms, a staff room, and a cafeteria/commons], installation of new exterior windows, installation of a new roof on the entire structure, installation of accessible doors / hardware, installation of one side of a two-hour wall assembly (second side to be completed in phase II), convert a portion of the site to be a play field (connected on accessible route), and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/201410/15/201410/15/2014PPASS
DetailsJim Storey
Nate Phone #: ###-#### final ok
BLD-Final8/11/20148/12/20148/12/2014APART
DetailsJim Storey
nate Phone #: ###-####tco ok pending partitions in resaroom
FIRE-Final Inspection8/8/20148/11/20148/11/2014APASS
DetailsForrest France
C/N items finished. Fire life safety inspection completed satisfactory.
FIRE-Final Inspection8/8/20148/8/20148/8/2014PPART
DetailsForrest France
Fire life safety final pending project related fire alarm permit work, repair of one EM light, post building address numbers, repair one exit sign.
BLD-Other7/30/20147/31/20147/31/2014APASS
DetailsJim Storey
Nate-Drag connection Phone #: ###-#### roof drag ok to cover.
BLD-Ceiling Grid Inspection7/24/20147/24/20147/24/2014PPASS
DetailsJim Storey
Nate Phone #: ###-#### balance of ceillings ok/ drag strut hardware per drawing ok.
BLD-Ceiling Grid Inspection7/8/20147/8/20147/8/2014PPASS
DetailsJim Storey
Nate Phone #: ###-#### ceillings ok allbur center rms ok to cover upon hvac/ele and fire arrpvals.
BLD-Framing/Rough-in6/24/20146/24/20146/24/2014PPASS
DetailsJim Storey
Nate-fire wall Phone #: ###-#### coil strap nailling ok/ fire wall ok remove duct.
BLD-Framing/Rough-in6/12/20146/12/20146/12/2014PPASS
DetailsJim Storey
Nate Phone #: ###-#### sheer ok
BLD-Other6/9/20146/9/20146/9/2014PFAIL
DetailsJim Storey
1st layer sheet rock// Nate Phone #: ###-####
BLD-Framing/Rough-in5/28/20145/28/20145/28/2014PPART
DetailsJim Storey
Nate Phone #: ###-#### need si for hold downs/ ok to one sde south end