BLD-Aging Inspection | 3/2/2015 | 3/2/2015 | 3/2/2015 | | DEFR |
Jim Storey
|
|
|
pending p&z sign off
|
BLD-Final | 12/30/2014 | 12/30/2014 | 12/30/2014 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### pending p&z sign off
|
FIRE-Final Inspection | 12/22/2014 | 12/22/2014 | 12/22/2014 | P | PASS |
Forrest France
|
|
|
Inspection passed. Fire life safety finaled.
|
FIRE-Final Inspection | 12/19/2014 | 12/19/2014 | 12/19/2014 | P | PART |
Forrest France
|
|
|
Fire life safety inspection completed- Final pending project related fire sprinkler permit C/N items and final.
|
BLD-Final | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | NR |
Jim Storey
|
|
|
sign off card is right inside the building//Jim Phone #: ###-####
|
FIRE-Final Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | DONE |
Forrest France
|
|
|
On site conference regarding project related fire alarm work, knox box, address numbers, outside WF bell and FDC placements.
|
BLD-Framing/Rough-in | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Other | 8/13/2014 | 8/14/2014 | 8/14/2014 | A | PASS |
Jim Storey
|
|
|
rebar .. Jim Phone #: ###-####
|
BLD-Foundation | 7/25/2014 | 7/28/2014 | 7/28/2014 | A | PASS |
Jim Storey
|
|
|
Jim-rebar Phone #: ###-#### wall panel rebar pending si report
|
BLD-Foundation | 7/15/2014 | 7/15/2014 | 7/15/2014 | P | PASS |
Jim Storey
|
|
|
after 5:00 vapor barrior in place for slab floor ok to place.
|
BLD-Footing | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PART |
Jim Sly
|
|
|
Jim-###-####-pour time 10:00 90% footing.......Less ramp area and approx 12' section West wall .......OK .Pending MTI special inspection, tests and approvals.
|
BLD-Conference | 6/24/2014 | 6/25/2014 | 6/25/2014 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Conference | 6/24/2014 | 6/24/2014 | 6/24/2014 | P | DEFR |
Jim Storey
|
|
|
Jim Phone #: ###-####
|