Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD14-00920
StatusFinaled
Name BAKER CONSTRUCTION
Site Address 1001 W IDAHO ST
Project NameWashington Federal
Customer Number 
ePlanReviewYes
Description
(WASHINGTON FEDERAL - 1ST STORY) (9-10-14 PLAN MODIFICATION TO SHIFT AN EGRESS DOOR, ENLARGE THE TWO RESTROOMS, UPGRADE EXISTING SHAFTS TO COMPLY AS ENCLOSED 1-HR FIRE-RESISTANCE-RATED SHAFTS, INSTALL A NEW DRIVE-UP WINDOW, DELETE 2 SMALL CONFERENCE ROOMS AND CONSTRUCT A 250 SQUARE FOOT CONFERENCE ROOM, AND INSTALL DUCT WORK IN ANTICIPATION OF A NEW HVAC SYSTEM TO BE INSTALLED UNDER A FUTURE PERMIT.) Fire sprinkler system is used for story and building area increase. To remodel the 4,478 square foot bank tenant space located on the 5,617 square foot 1st story of an existing 4 story with basement building. Work is to include 2 restrooms accessible to the disabled, drinking fountains accessible to the disabled, interior nonbearing walls, suspended acoustical ceilings, interior windows, interior doors, millwork, and finishes. New aluminum storefront will be installed at the edge of the 2nd story to create an atmospheric separation between the 1st story and the 2nd story. Exit signs and emergency lighting will be provided. Since there is or will be an A-3 Occupancy in the basement, doors located on the egress path from the basement are required to have panic hardware. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/4/201511/5/201511/5/2015APASS
DetailsMike Jordan
John Phone #: ###-####. Ok to occ. 1st. floor.
BLD-Final10/15/201410/15/201410/16/2014PPART
DetailsDave Hannah
John Phone #: ###-#### ok for temp occ ok for perm occ after mec gos perm
FIRE-Final Inspection10/14/201410/15/201410/15/2014APASS
DetailsForrest France
Fire life safety inspection okay for final pending directional arrows as discussed at two exit signs, remove keyed locking hardware at the conference room door. Items to be finished prior to structural final as agreed. Inspection passed.
BLD-Ceiling Grid Inspection9/15/20149/16/20149/16/2014APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in8/14/20148/15/20148/15/2014PPASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in8/12/20148/13/20148/15/2014PPASS
DetailsDave Hannah
John Hare Phone #: ###-####