BLD-Final | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### temp ok pending stair instaltion
|
FIRE-Final Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 8/19/2014 | 8/20/2014 | 8/20/2014 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the existing fire alarm has been extended into the new area.
|
BLD-Ceiling Grid Inspection | 8/13/2014 | 8/14/2014 | 8/14/2014 | A | PASS |
Jim Storey
|
|
|
Jeffrey Phone #: ###-####
|
FIRE-Final Inspection | 8/12/2014 | 8/13/2014 | 8/13/2014 | A | PART |
Forrest France
|
|
|
Walkthrough to verify fire sprinkler coverage prior to ceiling cover, discussed project scope, trade permits, and schedule.
|
BLD-Ceiling Grid Inspection | 8/12/2014 | 8/13/2014 | 8/13/2014 | A | NR |
Jim Storey
|
|
|
Jeffery Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/11/2014 | 8/12/2014 | 8/12/2014 | P | DEFR |
Jim Storey
|
|
|
Jeffery Phone #: ###-####out of time
|
BLD-Framing/Rough-in | 7/28/2014 | 7/29/2014 | 7/29/2014 | A | PART |
Jim Storey
|
|
|
Jeffrey Phone #: ###-####framing ok c/n stair access must meet all stair codes due to use of mez changing to occupied.// how will mech ventalition be meet?
|