BLD-Final | 6/10/2015 | 6/11/2015 | 6/11/2015 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PART |
Mike Jordan
|
|
|
MIke Phone #: ###-####. All outstanding building issues have been resolved. Needs fire/life/safety reinspection gor compressor room. Also the outstanding electrical permit should be attached to the BLD for the car wash addition. Contractor to reschedule final when fire/life/safety has finaled and will be ok for perm occ.
|
BLD-Final | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | DONE |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Noted to contractor to send request to building offical for approval.
|
BLD-Final | 1/29/2015 | 1/30/2015 | 1/30/2015 | P | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Ok for temp occ.
|
FIRE-Final Inspection | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PART |
Troy Cobbley
|
|
|
Phase one life safety is complete (New shop/Office Area). Need parking lot/fire dept access completed (being bonded) and the air compressor room completed
|
FIRE-Final Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | P | FAIL |
Troy Cobbley
|
|
|
Need all small documents, need the 20' fire dept access clearance around the entire building as per the approved plans, need signage on the electrical room, need the existing "No Parking Fire Lane" signs replaced due to weathering.
|
FIRE-Conference | 1/26/2015 | 1/26/2015 | 1/26/2015 | P | DONE |
Troy Cobbley
|
|
|
Mike and I discussed life safety requirements and phasing of the project.
|
BLD-Ceiling Grid Inspection | 1/16/2015 | 1/20/2015 | 1/20/2015 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Energy code compliance | 12/23/2014 | 12/26/2014 | 12/26/2014 | A | PASS |
Jim Storey
|
|
|
insulation // Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 12/23/2014 | 12/24/2014 | 12/24/2014 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### c/n made ok/ interior and ext. ok
|
BLD-Framing/Rough-in | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | FAIL |
Mike Jordan
|
|
|
Mike Phone #: ###-####. framing for exterior soffit, rigid attachment not per plan. Provide RFI from engineer or construct per approved plans.
|
BLD-Framing/Rough-in | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PASS |
Mike Jordan
|
|
|
Mike-partial Phone #: ###-####. INterior steel stud framed walls for new restrooms ok.
|
BLD-Other | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | CANC |
Mike Jordan
|
|
|
sewer// mike Phone #: ###-####. Wrong inspection division. Contacted Mike.
|
BLD-Framing/Rough-in | 11/20/2014 | 11/20/2014 | 11/20/2014 | P | PART |
Mike Jordan
|
|
|
Mike-roof decking Phone #: ###-####. work in progress. Needs to complete perimeter puddle welds. Areas completed have had special inspection. aslo reviewed special inspection reports to date.
|
BLD-Footing | 10/14/2014 | 10/14/2014 | 10/14/2014 | P | DEFR |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Column pad footings west of new addition, special inspector on site.
|
BLD-Other | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | CANC |
Mike Jordan
|
|
|
Dennis Phone #: ###-####wrong permit called in.
|
BLD-Other | 9/22/2014 | 9/23/2014 | 9/23/2014 | P | CANC |
Mike Jordan
|
|
|
Mike// seepage bed Phone #: ###-####
|
BLD-Other | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PEND |
Dave Hannah
|
|
|
Grout pour at 12 - Mike Phone #: ###-#### ok after spec inspection
|
BLD-Footing | 8/19/2014 | 8/19/2014 | 8/19/2014 | P | PASS |
Phil Shearer
|
|
|
Late afternoon pouring at 7am - Mike Phone #: ###-####
|