Treasure Valley Steel - Storage Addition - Construction of a 40 x 125 x 16 pre-engineered steel building addition for the storage of steel coil, metal fasteners and metal roofing products.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/11/201412/11/201412/11/2014ADONE
DetailsJim Storey
as per Jim Storey 301 final passed
BLD-Final12/1/201412/2/201412/2/2014APART
DetailsJim Storey
steve Phone #: ###-#### final ok pending pw
FIRE-Final Inspection12/1/201412/1/201412/1/2014PPASS
DetailsForrest France
Life safety inspection passed.
BLD-Footing9/30/20149/30/20149/30/2014PFAIL
DetailsMike Jordan
Craig Phone #: ###-####. Install reinforcement per approved plans. Bottom reinforcement is required to be epoxied into existing footing and requires special inspection. Noted to contractor if he still wants to place concrete in the a.m. to have special inspector inspect and verify proper construction for column pad footings against existing building.
BLD-Foundation9/10/20149/11/20149/11/2014APASS
DetailsMike Jordan
Craig Phone #: ###-####
BLD-Footing9/8/20149/8/20149/8/2014PPASS
DetailsJim Storey
Craig Phone #: ###-####