BLD-Final | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Mike Jordan
|
|
|
Final Phone #: ###-#### Inspection requested via web by greg bauer
|
DOC - Permit Finaled | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/14/2014 | 8/15/2014 | 8/15/2014 | A | PASS |
Jim Sly
|
|
|
Framing/rough-in for Outdoor Structures before installing soffit. Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Footing | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | DONE |
Mike Jordan
|
|
|
Inspection if needed for metal post base attachment to concrete footing, now has been installed with the 1 1/2" of non shrink grout under metal plates per Engineering detail "A"; column base detail (attached). Phone #: ###-#### Inspection requested via web by greg bauer
|
BLD-Conference | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PASS |
Dave Hannah
|
|
|
Inspection for metal post base attachment to concrete footing. Phone #: ###-#### >> Inspection requested via web by greg bauer
|
BLD-Footing | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PART |
Tom Arcoraci
|
|
|
Herron Phone #: ###-#### wip ok
|