FIRE-Final Inspection | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PART |
Troy Cobbley
|
|
|
Upper area blow-in insulation complete on the west side, east side and south sides. North side has installation issues at this time. Fire blocking for the underside not started yet.
|
FIRE-Conference | 3/11/2015 | 3/11/2015 | 3/12/2015 | P | DONE |
Troy Cobbley
|
|
|
Robert and I discussed the parapet and I deferred him to tim frost for the minimal sprinkler requirements.
|
FIRE-Conference | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | DONE |
Troy Cobbley
|
|
|
Derek spoke about meeting the requirements of NFPA 13 for filling a space entirely with non-combustible insulation for one area and sectioning off another area to meet the less than 160 cubic foot rule/exception. I agreed to both as long as they meet code.
|
BLD-Final | 9/23/2014 | 9/24/2014 | 9/24/2014 | P | NR |
Phil Shearer
|
|
|
Brain Phone #: ###-####
|
FIRE-Final Inspection | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | FAIL |
Troy Cobbley
|
|
|
The new overbuilds create combustible concealed spaces that need to meet the requirements of NFPA 13 which may include addtion/modification to the existing fire sprinkler system.
|
BLD-Final | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | CANC |
Phil Shearer
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PASS |
Phil Shearer
|
|
|
Brian Phone #: ###-####
|