Permit Information
Permit NumberBLD14-01628
StatusFinaled
Name RUSSELL CONSTRUCTION INC
Site Address 5500 S FEDERAL WAY
Project NameORE PAC
Customer Number 
ePlanReviewNo
Description
(ORE PAC - Warehouse Expansion) MODIFICATION TO ADD A 2,277 SQ. FT. CANOPY TO THE SOUTH SIDE AND TWO 280 SQ. FT. CANOPIES TO THE NORTH SIDE OF THE BUILDING. For the construction of a 43,719 sq. ft. addition to an existing 63,833 sq. ft. warehouse/manufacturing/office building with work to include the construction of a new 43,719 sq. ft. steel building per the approved plans and the removal of the wall on the east end of the existing structure. Under BLD13-03145 a three hour wall was required on the north side along with three hour opening protectives since the separatin distance to the ajacent building to the north is less than 60' and this is an unlimited area building. The outside of the 3 hour assembly was not required to be completed untill construction of this addition commenced. The exterior portion of the three hour assembly on the existing building is required to be completed prior to occupancy of the addition. NO RACKING IS ALLOWED UNDER THIS PERMIT. ANY RACKING OVER 8 FEET IN HEIGHT REQUIRES A SEPARATE RACKING PERMIT. This is a fully sprinklerd buiding for unlimited area with an alarm system; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/21/20158/21/20158/21/2015APASS
DetailsJim Page
Life fire safety passed/complete
BLD-Final8/20/20158/21/20158/21/2015APASS
DetailsDave Hannah
Hello Jim, We are ready for final. Please call before heading to job if possible. thank you and see you tomorrow. Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Final8/6/20158/7/20158/7/2015PNR
DetailsJim Storey
Looking for final in the early afternoon 2:00ish after the Fire has passed.
Thanks Jim Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Final5/8/20155/8/20155/8/2015PDONE
DetailsJim Storey
Thank you again Jim.. Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Final5/6/20155/7/20155/8/2015PPASS
DetailsJim Storey
Jim I am hoping to get my final shortly after lunch if that works for you. Kathy needs to inspect Fire Life/ Safety in the morning first.
Thank you
Derek Phone #: ###-#### Inspection requested via web by Derek Jackson temp ok pending all others.
FIRE-Final Inspection5/6/20155/7/20155/7/2015APART
DetailsKatie Marron
Partial fire life safety pass for new portion of building. Items to fix before final: new inspection tags on 2 fire extinguishers, hang fire extinguisher located by electrical panels, complete install of emergency exit sign at side middle door, and fix back middle door that is jammed. Permit cannot be finaled until fire suppression tie in of existing building system is completed.
BLD-Conference4/2/20154/3/20154/3/2015APASS
DetailsJim Storey
Would like to meet to go over project for final.
Thanks Jim... Phone #: ###-#### Inspection requested via web by Derek Jackson 10:00 appt.
BLD-Conference4/1/20154/2/20154/2/2015ADEFR
DetailsJim Storey
Would like to meet to go over project for final.
Thanks Jim... Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in2/11/20152/12/20152/12/2015APASS
DetailsJim Storey
Framing inspection on riser room walls. corrections made.

Thank you Jim Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Conference2/3/20152/4/20152/4/2015AFAIL
DetailsJim Storey
framing inspection for riser room at North East corner of building.
Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Wall cover1/5/20151/5/20151/5/2015PPASS
DetailsJim Storey
I am not on site but the wall in need of inspection is located on the south east corner where the overhang is. 3 hour fire wall same as the main fire wall that you have inspected.

Thanks Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in1/5/20151/5/20151/5/2015PPASS
DetailsJim Storey
I am not on site but the wall in need of inspection is located on the south east corner where the overhang is. 3 hour fire wall same as the main fire wall that you have inspected.

Thanks Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Energy code compliance12/19/201412/19/201412/19/2014PPASS
DetailsJim Storey
Insulation inspection on North wall were the roll up door was removed. This location is where the existing and the new come together.

\Thank you
Derek Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Wall cover12/19/201412/19/201412/19/2014PPASS
DetailsJim Storey
drywall inspection where the existing roll up door was removed on the North wall where the new addition and existing building come together. This is a continuation of what was already inspected on the other section of wall.

Thank you!
Derek Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in12/19/201412/19/201412/19/2014PPASS
DetailsJim Storey
Framing inspection where the existing roll up door was removed on the North wall where the new addition and existing building come together. This is a continuation of what was already inspected on the other section of wall.

Thank you!
Derek Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Wall cover12/12/201412/12/201412/12/2014PPASS
DetailsJim Storey
Outside East exterior wall. I missed the am inspection dead line however we are ready to side now. I thought this was passed but noticed the inspection said partial. Thank you again Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Energy code compliance12/10/201412/10/201412/10/2014PPASS
DetailsDave Hannah
Second half of insulation inspection. Thank you Mike. Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Energy code compliance12/4/201412/4/201412/4/2014PPART
DetailsMike Jordan
Looking for insulation cover inspection. Phone #: ###-#### Inspection requested via web by Derek Jackson. 5 inch mineral wool insulation at 3hr. firewall, south east half only.
BLD-Wall cover11/26/201411/26/201411/27/2014PPART
DetailsMike Jordan
East wall first layer of drywall inspection on 3 hour wall. Call if there is any issues and thank you. Hope you have a good Thanksgiving Phone #: ###-#### Inspection requested via web by Derek Jackson. wip.
BLD-Framing/Rough-in11/12/201411/13/201411/13/2014APASS
DetailsJim Storey
###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in11/7/201411/10/201411/12/2014PDEFR
DetailsJim Storey
Looking for a framing inspection for the East wall new framing. I will not be on site so if you need access to the plans there is a lock box on trailer hand rail and the combo is my last four digits of my phone number. 6692 Thank you again,
Derek Jackson Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in10/20/201410/20/201410/20/2014PPASS
DetailsJim Storey
Second layer of drywall to be inspected on existing building. Phone #: ###-#### Inspection requested via web by Derek Jackson
BLD-Framing/Rough-in10/9/201410/13/201410/13/2014APART
DetailsJim Storey
This is for the drywall inspection that we talked about on Thursday. See you Monday. Thank you
503*###-#### Phone #: ###-#### Inspection requested via web by Derek Jackson 3hr 1st later ok
BLD-Framing/Rough-in10/8/201410/9/201410/9/2014APART
DetailsJim Storey
Spoke with Jim Storey about a am inspection.
Please give me a 30 minute call ahead if possible.
Thank you Phone #: ###-#### Inspection requested via web by Derek Jackson sfd in place ok 3 layer membrane.
BLD-Framing/Rough-in10/6/201410/7/201410/7/2014AFAIL
DetailsJim Storey
Vic Phone #: ###-#### arch to address opening protrction and wall listing.