BLD-Final | 12/19/2014 | 12/19/2014 | 12/19/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Final | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
FIRE-Final Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 | P | PASS |
Forrest France
|
|
|
C/N items verified. Life safety finaled.
|
FIRE-Final Inspection | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire dept access signage at entrance as discussed, provide additional fire extinguisher in basement, remove deadbolt from interior door, provide remote annunciator/testing of the duct smoke detector.
|
BLD-Ceiling Grid Inspection | 11/18/2014 | 11/18/2014 | 11/18/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Ceiling Grid Inspection | 11/12/2014 | 11/13/2014 | 11/13/2014 | A | NR |
Mike Jordan
|
|
|
please park at the nail salon next door Phone #: ###-#### Inspection requested via web by Jared Waggoner. Needs electrical and mech. rough in inspections first.
|
BLD-Energy code compliance | 10/14/2014 | 10/15/2014 | 10/15/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Energy code compliance | 10/13/2014 | 10/14/2014 | 10/14/2014 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner north side ok
|
BLD-Energy code compliance | 10/10/2014 | 10/13/2014 | 10/13/2014 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner air seal ok
|
BLD-Energy code compliance | 10/13/2014 | 10/13/2014 | 10/13/2014 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggonerairseal ok
|
BLD-Framing/Rough-in | 10/9/2014 | 10/10/2014 | 10/10/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Framing/Rough-in | 10/7/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner exterior
|
BLD-Wall Bracing | 10/8/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner ok to cover exterior/ 316 aproved soffit framing for cover.
|
BLD-Framing/Rough-in | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | PART |
Jim Sly
|
|
|
Drive through canopy roof nailing inspection, exterior soffit framing Phone #: ###-#### Inspection requested via web by Jared Waggoner OK
|
BLD-Concrete | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | PART |
Jim Sly
|
|
|
reinforcing inspection of fence CMU pilasters prior to grout at 3pm. Phone #: ###-#### Inspection requested via web by Jared Waggoner OK.
|
BLD-Framing/Rough-in | 9/29/2014 | 9/30/2014 | 9/30/2014 | P | PART |
Jim Sly
|
|
|
Roof Framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner Roof nailing and fence pilasters......OK.
|
BLD-Foundation | 9/12/2014 | 9/15/2014 | 9/15/2014 | A | PASS |
Jim Storey
|
|
|
Inspection of below grade concrete related to CMU fence pilasters. Requested time 11am. Will call concrete for 1pm Phone #: ###-#### Inspection requested via web by Jared Waggoner depth and rebar ok
|
BLD-Concrete | 9/8/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Jim Storey
|
|
|
Energy inspection at below grade (underslab) and reinforced slab on deck. Concrete slab poured 9/10 at 6am with special inspection. Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Foundation | 9/5/2014 | 9/8/2014 | 9/8/2014 | A | PASS |
Jim Storey
|
|
|
Concrete column piers in drive through and trash enclosure walls. Concrete onsite at 8:45am. Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Footing | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PASS |
Jim Storey
|
|
|
request 11am // Jared Phone #: ###-#### pad ft for drive thru placed with si ok
|
BLD-Energy code compliance | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | PASS |
Jim Storey
|
|
|
Foundation wall vertical only subgrade 2" rigid insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Foundation | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | PASS |
Jim Storey
|
|
|
Please arrive around 11am for inspection. Concrete is expected at 1:30pm same day. Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Footing | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | PASS |
Phil Shearer
|
|
|
Exterior building footing
|
BLD-Footing | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | DEFR |
Jim Storey
|
|
|
Jared Phone #: ###-####to 470
|
BLD-Foundation | 8/1/2014 | 8/1/2014 | 8/1/2014 | P | PASS |
Jim Storey
|
|
|
Basement wall reinforcing inspection. Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Footing | 7/24/2014 | 7/25/2014 | 7/25/2014 | A | PASS |
Phil Shearer
|
|
|
Jared Phone #: ###-#### Basement footings
|