BLD-Final | 9/25/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Tony Young
|
|
|
Late in the day - Shannon Phone #: ###-####,, existing floor levels on south door and door size
|
FIRE-Final Inspection | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Forrest France
|
|
|
Noted correction items verified for completion. Life safety final approved.
|
FIRE-Final Inspection | 9/25/2014 | 9/29/2014 | 9/29/2014 | A | FAIL |
Forrest France
|
|
|
C/N items include; remove hardware at the non-functional non-required door upper level west side, provide signage at the main entry/exit per plan review comments, reverse hardware at the door to the mechanical closet.
|
BLD-Conference | 9/23/2014 | 9/24/2014 | 9/24/2014 | P | PART |
Tony Young
|
|
|
Gary Phone #: ###-####
|
BLD-Conference | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | PART |
Tony Young
|
|
|
Gary Phone #: ###-####,, handrail ?s,, existing stairs on interior,, need 2 hand rails
|
BLD-Wall cover | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, ok to cover pend mechanical
|
BLD-Wall cover | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####,, need mech full pass
|
BLD-Wall cover | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####,, pending mech full pass
|
BLD-Energy code compliance | 8/26/2014 | 8/26/2014 | 8/26/2014 | P | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, ok to cover pending mechanical
|
BLD-Energy code compliance | 8/25/2014 | 8/26/2014 | 8/26/2014 | A | PEND |
Tony Young
|
|
|
Shannon Phone #: ###-####,, pending,,
|
BLD-Energy code compliance | 8/22/2014 | 8/26/2014 | 8/26/2014 | A | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, ok pending mechanical full pass
|
BLD-Framing/Rough-in | 8/18/2014 | 8/25/2014 | 8/25/2014 | P | PART |
Tony Young
|
|
|
Shannon Phone #: ###-####,, need to verify mech full approval for cover,, need to verify mech ok to cover,, moving door in upper restroom per new modification,, ok to insulate
|
BLD-Conference | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PEND |
Tony Young
|
|
|
Mark; Phone #: ###-####
|
BLD-Conference | 8/19/2014 | 8/21/2014 | 8/21/2014 | P | PEND |
Tony Young
|
|
|
Shannon Phone #: ###-####,, frame walk through,, also needs review of changes to upper bathroom
|
BLD-Framing/Rough-in | 8/18/2014 | 8/21/2014 | 8/21/2014 | P | PART |
Tony Young
|
|
|
Shannon Phone #: ###-####,, ?s,, work in progress
|
BLD-Conference | 8/20/2014 | 8/21/2014 | 8/21/2014 | A | PASS |
Tony Young
|
|
|
please call before-Mark Phone #: ###-####,, frame ?s
|
BLD-Conference | 8/4/2014 | 8/5/2014 | 8/5/2014 | A | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, looking at under floor issues
|
BLD-Conference | 8/4/2014 | 8/4/2014 | 8/4/2014 | P | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####
|