Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberBLD14-01769
StatusFinaled
Name MASON CYNTHIA J
Site Address 11922 W LA PAN DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for the 1929s.f. 2-story addition to an existing 1350s.f. 1-story single familydwelling. The construction will be mainly of permainent form construction per IRC R611. The addition will create a 3-level dwelling with a new basement lower level, the level of the existing dwelling and an upper level. There is to be a 674s.f. family room with a wet bar in the lowest level, the existing 1350s.f. main level with added floor area of 135s.f on the main level and an upper level of 1120s.f. that will be a new master suite and nook area. Separate electrical, plumbing,mechanical and ESC permits are required. R-1B ok per Sue Cummings. All per the approved plans as marked, Prescriptive energy option and the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/26/20177/26/20177/26/2017PPASS
DetailsMike Jordan
Ted Phone #: ###-####
DOC - Permit Finaled7/26/20177/26/20177/26/2017PPASS
DetailsMike Jordan
BLD-Final7/10/20177/10/20177/10/2017PNR
DetailsMike Jordan
Ted Phone #: ###-####. Needs to install handrail.
BLD-Framing/Rough-in7/10/20177/10/20177/10/2017PPASS
DetailsMike Jordan
Ted Phone #: ###-####
BLD-Footing5/25/20175/25/20175/25/2017PPASS
DetailsMike Jordan
footing insp for deck // Ted Mason Phone #: ###-####
BLD - Request for Extension5/18/20175/18/20175/18/2017PPEND
DetailsMike Jordan
Ted Mason Phone #: ###-####. Called and left message for Ted. Noted that he needs to send a letter to B.O. for extension request.
BLD-Framing/Rough-in12/5/201612/5/201612/5/2016PCANC
DetailsMike Jordan
would like call ahead; Ted Phone #: ###-####
BLD-Final12/5/201612/5/201612/5/2016PPART
DetailsMike Jordan
would like call ahead; Ted Phone #: ###-####. Addition is completed and is ok. Needs to complete exterior 2nd. floor deck. Per homeowner should begin this spring.
BLD-Conference7/8/20167/11/20167/11/2016PPASS
DetailsPhil Shearer
Ted Phone #: ###-####
BLD-Conference9/29/20159/29/20159/29/2015PPASS
DetailsJim Sly
Ted (husband) Phone #: ###-####
BLD-Conference6/11/20156/12/20156/12/2015ADONE
DetailsJim Sly
Ted Phone #: ###-####
WIP
BLD-Framing/Rough-in12/12/201412/15/201412/15/2014PPASS
DetailsJim Sly
Ted Phone #: ###-####
BLD-Other9/10/20149/11/20149/11/2014APART
DetailsJim Sly
Rob- rebar insp Phone #: ###-####
First story..........OK
BLD-Framing/Rough-in8/21/20148/21/20148/22/2014PCANC
DetailsDave Hannah
Ted Mason Phone #: ###-####
BLD-Framing/Rough-in8/22/20148/22/20148/22/2014APART
DetailsJim Sly
Ted Mason Phone #: ###-#### please call befor
Continuing inspection on concrete wall system.
BLD-Foundation8/6/20148/7/20148/7/2014APASS
DetailsDave Hannah
Bill Phone #: ###-####
BLD-Footing8/5/20148/5/20148/5/2014PPASS
DetailsDave Hannah
Bill Phone #: ###-####