Permit Information
Permit NumberBLD14-01825
StatusFinaled
Name ESI
Site Address 501 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer NumberBLD14-01818 FOR DRAWNGS
ePlanReviewNo
Description
(THE DISTRICT AT PARKCENTER - FITNESS CENTER) (The drawings are filed under permit BLD14-01818 in ePlanReview) This building does not have a fire sprinkler system. To construct a new 2,086 square foot one story building to be used as a fitness building for the apartment occupants on this site. Work is to include 2 restrooms accessible to the disabled, “high” and “low” drinking fountains, interior nonbearing walls, interior doors, exterior windows and doors, insulated exterior walls, exterior siding, exterior manufactured stone, standing seam metal roof coverings, single ply roof coverings, continuous foam plastic insulation installed on top of the roof decks, suspended gypsum board ceilings, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, glu-lam beams, glu-lam columns, roof joists, bearing walls, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. A separate permit is required for the swimming pool and the barrier around it. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/5/20174/6/20174/6/2017APASS
DetailsJim Storey
Matt ###-####
BLD-Final3/30/20173/31/20174/5/2017ADEFR
DetailsJim Storey
Matt ###-####
BLD-Final3/22/20173/30/20173/31/2017PDEFR
DetailsJim Storey
Matt ###-####
FIRE-Final Inspection3/22/20173/29/20173/29/2017APASS
DetailsJim Page
Exit discharge to pool area is complete, final life fire safety inspection passed/complete.
BLD-Final1/30/20171/31/20171/31/2017PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Final1/24/20171/27/20171/26/2017ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
FIRE-Final Inspection1/24/20171/25/20171/25/2017APART
DetailsKatie Marron
Life Safety inspection complete. Left pair of double doors to patio area needs repair, exit will not be allowed through door until patio area is complete.
BLD-Final1/24/20171/25/20171/24/2017ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
FIRE-Conference1/13/20171/13/20171/13/2017PDONE
DetailsJim Page
Fire conference complete
BLD-Framing/Rough-in10/7/201610/7/201610/7/2016PPART
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Corey Hockersmith. Straping not verified OK to insulate
BLD-Framing/Rough-in9/28/201610/4/201610/4/2016ANR
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Corey Hockersmith. Missing nails in hangers at entery Check on straping.
BLD-Wall Bracing7/7/20167/11/20167/11/2016APASS
DetailsJim Storey
Wall and roof sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing7/6/20167/7/20167/7/2016AFAIL
DetailsJim Storey
Wall and roof sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing6/28/20166/29/20166/29/2016PFAIL
DetailsJim Storey
Roof and wall sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmithc/n
BLD-Wall Bracing5/31/20166/1/20166/1/2016APASS
DetailsJim Storey
Roof and wall sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmithc/n made ok
BLD-Aging Inspection2/16/20162/16/20162/16/2016 NR
DetailsJim Storey
BLD-Aging Inspection2/15/20162/15/20162/16/2016 NR
DetailsJim Storey