BLD-Final | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
BLD-Final | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | CANC |
Dave Hannah
|
|
|
Corey Phone #: ###-####
|
BLD-Aging Inspection | 1/2/2017 | 1/2/2017 | 1/4/2017 | | NR |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/30/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Final Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PART |
Jim Page
|
|
|
Club house structure contains main Fire Alarm Control Unit for entire complex (BLD14-01818). When Clubhouse structure is finaled, the remaining builidings can be finaled in the system. Final fire sprinkler inspection complete, final fire sprinkler underground supply inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, final life fire safety inspection passed/complete.
|
BLD-Conference | 8/29/2016 | 8/30/2016 | 8/30/2016 | A | PART |
Jim Storey
|
|
|
Corey Phone #: ###-#### wip
|
BLD-Other | 8/2/2016 | 8/2/2016 | 8/2/2016 | A | PASS |
Jim Storey
|
|
|
Electrical penetration fire caulk in bathrooms Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Other | 7/22/2016 | 7/25/2016 | 7/25/2016 | A | PASS |
Jim Storey
|
|
|
Inspect fire extinguisher cabinet openings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Other | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Jim Storey
|
|
|
Penetrations behind cabinets in bath and kitchen''s all three floors Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | PART |
Jim Storey
|
|
|
Bathroom behind cabinets all three floors Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 5/23/2016 | 5/25/2016 | 5/25/2016 | P | NR |
Jim Storey
|
|
|
Bathroom behind cabinets all three floors Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | PART |
Jim Storey
|
|
|
Bathroom ceiling grid and fire stop Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
|
BLD-Wall cover | 3/16/2016 | 3/17/2016 | 3/17/2016 | P | PASS |
Jim Storey
|
|
|
RC inspection third floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Conference | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | CANC |
Jim Storey
|
|
|
Level 2 RC Phone #: ###-#### Inspection requested via web by Kevin Honeycut pass ok to cover
|
BLD-Framing/Rough-in | 3/7/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt c/n made ok framing ok to insulate roof/ truss letter to be on site
|
BLD-Framing/Rough-in | 3/4/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt 2nd floor exterior wall insulation/ dryer vent stud bay 5/8 wrap ok
|
BLD-Energy code compliance | 3/2/2016 | 3/3/2016 | 3/3/2016 | A | PASS |
Jim Storey
|
|
|
RC channel inspection 1st floor west half Phone #: ###-#### Inspection requested via web by Corey Hockersmithok to cover all bur bathrms
|
BLD-Wall cover | 2/29/2016 | 3/2/2016 | 3/2/2016 | P | DEFR |
Jim Storey
|
|
|
RC channel inspection 1st floor west half Phone #: ###-#### Inspection requested via web by Corey Hockersmith thur am
|
BLD-Framing/Rough-in | 3/1/2016 | 3/1/2016 | 3/1/2016 | P | PART |
Jim Storey
|
|
|
Re inspect second floor west side. Third floor west side. Phone #: ###-#### Inspection requested via web by Corey Hockersmith 2nd ok/ 3rd part c/n issued
|
BLD-Framing/Rough-in | 2/26/2016 | 2/29/2016 | 2/29/2016 | P | PASS |
Jim Storey
|
|
|
Second floor re inspection and third floor inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n idems to check on 2nd and corridor north on first. ok to insulate 2nd
|
BLD-Framing/Rough-in | 2/24/2016 | 2/25/2016 | 2/25/2016 | P | PASS |
Jim Storey
|
|
|
First floor west side Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to insulate
|
BLD-Framing/Rough-in | 2/23/2016 | 2/24/2016 | 2/24/2016 | P | NR |
Jim Storey
|
|
|
First floor west side Phone #: ###-#### Inspection requested via web by Corey Hockersmith mech c/n
|
BLD-Framing/Rough-in | 2/19/2016 | 2/22/2016 | 2/22/2016 | A | NR |
Jim Storey
|
|
|
First floor re inspection. Second floor framing inspection. Phone #: ###-#### Inspection requested via web by Corey Hockersmith 2hr listing pex and fire spk/4 in clean outs
|
BLD-Framing/Rough-in | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | NR |
Jim Storey
|
|
|
First floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 2/15/2016 | 2/16/2016 | 2/16/2016 | P | PART |
Jim Storey
|
|
|
West side first floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith 1 of 2 c/n posted
|
BLD-Wall Bracing | 1/7/2016 | 1/11/2016 | 1/8/2016 | A | CANC |
Jim Storey
|
|
|
Roof sheer and strapping Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Wall Bracing | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PASS |
Jim Storey
|
|
|
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith first floor exterior sheer ok/ interior need extention of coridor osb installed.
|
BLD-Wall Bracing | 12/1/2015 | 12/3/2015 | 12/3/2015 | P | NR |
Jim Sly
|
|
|
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall Bracing | 12/1/2015 | 12/3/2015 | 12/3/2015 | A | NR |
Jim Sly
|
|
|
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall Bracing | 11/30/2015 | 12/1/2015 | 12/1/2015 | A | NR |
Jim Storey
|
|
|
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith sole plats not pinned/bottom sheathing not nailled to plate south wall/ overdriven nailling/ nailling between sheathing joint
|
BLD-Wall Bracing | 11/17/2015 | 11/23/2015 | 11/19/2015 | A | CANC |
Jim Storey
|
|
|
First and second floor sheer Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Concrete | 9/8/2015 | 9/9/2015 | 9/9/2015 | P | PASS |
Phil Shearer
|
|
|
Flatwork rebar and wire mesh Phone #: ###-#### Inspection requested via web by Corey Hockersmith. pending MTI inspection
|
FIRE-Final Inspection | 2/24/2017 | 2/24/2017 | | P | |
|
|
|
|