Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD14-01829
StatusFinaled
Name ESI
Site Address 509 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer NumberBLD14-01818 FOR DRAWNGS
ePlanReviewNo
Description
(THE DISTRICT AT PARKCENTER - INTOWN BUILDING A - #2) (The drawings are filed under permit BLD14-01818 in ePlanReview) (11-17-15 PLAN MODIFICATION TO RE-DESIGN THE STRUCTURAL SYSTEM FROM THE FOUNDATION UP. REVISED STRUCTURAL DRAWINGS ARE FILED UNDER BLD14-01828 IN EPLANREVIEW.) (8-25-15 PLAN MODIFICATION TO PROVIDE EXTERIOR EXPANDED POLYSTYRENE FOUNDATION INSULATION IN COMPLIANCE WITH SHALLOW FOUNDATION STANDARDS AT LOCATIONS WHERE THE BOTTOM OF THE FOOTINGS WILL BE LESS THAN 24 INCHES BELOW FINISHED GRADE. THE INTENT IS TO PREVENT FROST HEAVE.) Because there is a fire wall in this building, two permits were created. See BLD14-01828 for a full description of the work proposed. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/22/20172/23/20172/23/2017APASS
DetailsJim Storey
Corey Phone #: ###-####
BLD-Final2/21/20172/22/20172/22/2017ACANC
DetailsDave Hannah
Corey Phone #: ###-####
BLD-Aging Inspection1/2/20171/2/20171/4/2017 NR
DetailsJim Storey
BLD-Aging Inspection10/31/201610/31/201610/31/2016 PASS
DetailsJim Storey
BLD-Final8/30/20168/31/20168/31/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Final Inspection8/31/20168/31/20168/31/2016PPART
DetailsJim Page
Club house structure contains main Fire Alarm Control Unit for entire complex (BLD14-01818). When Clubhouse structure is finaled, the remaining builidings can be finaled in the system. Final fire sprinkler inspection complete, final fire sprinkler underground supply inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, final life fire safety inspection passed/complete.
BLD-Conference8/29/20168/30/20168/30/2016APART
DetailsJim Storey
Corey Phone #: ###-#### wip
BLD-Other8/2/20168/2/20168/2/2016APASS
DetailsJim Storey
Electrical penetration fire caulk in bathrooms Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other7/22/20167/25/20167/25/2016APASS
DetailsJim Storey
Inspect fire extinguisher cabinet openings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other5/31/20166/1/20166/1/2016APASS
DetailsJim Storey
Penetrations behind cabinets in bath and kitchen''s all three floors Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall cover5/25/20165/26/20165/26/2016PPART
DetailsJim Storey
Bathroom behind cabinets all three floors Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall cover5/23/20165/25/20165/25/2016PNR
DetailsJim Storey
Bathroom behind cabinets all three floors Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection4/22/20164/22/20164/22/2016PPART
DetailsJim Storey
Bathroom ceiling grid and fire stop Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
BLD-Wall cover3/16/20163/17/20163/17/2016PPASS
DetailsJim Storey
RC inspection third floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Conference3/9/20163/10/20163/10/2016ACANC
DetailsJim Storey
Level 2 RC Phone #: ###-#### Inspection requested via web by Kevin Honeycut pass ok to cover
BLD-Framing/Rough-in3/7/20163/8/20163/8/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt c/n made ok framing ok to insulate roof/ truss letter to be on site
BLD-Framing/Rough-in3/4/20163/7/20163/7/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt 2nd floor exterior wall insulation/ dryer vent stud bay 5/8 wrap ok
BLD-Energy code compliance3/2/20163/3/20163/3/2016APASS
DetailsJim Storey
RC channel inspection 1st floor west half Phone #: ###-#### Inspection requested via web by Corey Hockersmithok to cover all bur bathrms
BLD-Wall cover2/29/20163/2/20163/2/2016PDEFR
DetailsJim Storey
RC channel inspection 1st floor west half Phone #: ###-#### Inspection requested via web by Corey Hockersmith thur am
BLD-Framing/Rough-in3/1/20163/1/20163/1/2016PPART
DetailsJim Storey
Re inspect second floor west side. Third floor west side. Phone #: ###-#### Inspection requested via web by Corey Hockersmith 2nd ok/ 3rd part c/n issued
BLD-Framing/Rough-in2/26/20162/29/20162/29/2016PPASS
DetailsJim Storey
Second floor re inspection and third floor inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n idems to check on 2nd and corridor north on first. ok to insulate 2nd
BLD-Framing/Rough-in2/24/20162/25/20162/25/2016PPASS
DetailsJim Storey
First floor west side Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to insulate
BLD-Framing/Rough-in2/23/20162/24/20162/24/2016PNR
DetailsJim Storey
First floor west side Phone #: ###-#### Inspection requested via web by Corey Hockersmith mech c/n
BLD-Framing/Rough-in2/19/20162/22/20162/22/2016ANR
DetailsJim Storey
First floor re inspection. Second floor framing inspection. Phone #: ###-#### Inspection requested via web by Corey Hockersmith 2hr listing pex and fire spk/4 in clean outs
BLD-Framing/Rough-in2/17/20162/18/20162/18/2016ANR
DetailsJim Storey
First floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in2/15/20162/16/20162/16/2016PPART
DetailsJim Storey
West side first floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith 1 of 2 c/n posted
BLD-Wall Bracing1/7/20161/11/20161/8/2016ACANC
DetailsJim Storey
Roof sheer and strapping Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
BLD-Wall Bracing12/7/201512/8/201512/8/2015APASS
DetailsJim Storey
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith first floor exterior sheer ok/ interior need extention of coridor osb installed.
BLD-Wall Bracing12/1/201512/3/201512/3/2015PNR
DetailsJim Sly
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing12/1/201512/3/201512/3/2015ANR
DetailsJim Sly
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing11/30/201512/1/201512/1/2015ANR
DetailsJim Storey
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith sole plats not pinned/bottom sheathing not nailled to plate south wall/ overdriven nailling/ nailling between sheathing joint
BLD-Wall Bracing11/17/201511/23/201511/19/2015ACANC
DetailsJim Storey
First and second floor sheer Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
BLD-Concrete9/8/20159/9/20159/9/2015PPASS
DetailsPhil Shearer
Flatwork rebar and wire mesh Phone #: ###-#### Inspection requested via web by Corey Hockersmith. pending MTI inspection
FIRE-Final Inspection2/24/20172/24/2017 P 
Details