Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD14-01830
StatusFinaled
Name ESI
Site Address 533 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer NumberBLD14-01818 FOR DRAWNGS
ePlanReviewYes
Description
(THE DISTRICT AT PARKCENTER - INTOWN BUILDING B - #1) (The drawings are filed under permit BLD14-01818 in ePlanReview) (11-23-15 PLAN MODIFICATION TO RE-DESIGN THE STRUCTURAL SYSTEM FROM THE FOUNDATION UP. REVISED STRUCTURAL DRAWINGS ARE FILED UNDER BLD14-01830 IN EPLANREVIEW.) (10-2-15 PLAN MODIFICATION TO CONVERT A STORAGE ROOM LOCATED ON THE 1ST STORY TO A DOGWASH. WORK IS TO INCLUDE A FLOOR SINK, A FLOOR DRAIN, A SMALL WATER HEATER, ELECTRICAL SUPPLY, ELECTRICAL LIGHTING, EXHAUST FAN, AND A TRANSFER GRILL.) (8-25-15 PLAN MODIFICATION TO PROVIDE EXTERIOR EXPANDED POLYSTYRENE FOUNDATION INSULATION IN COMPLIANCE WITH SHALLOW FOUNDATION STANDARDS AT LOCATIONS WHERE THE BOTTOM OF THE FOOTINGS WILL BE LESS THAN 24 INCHES BELOW FINISHED GRADE. THE INTENT IS TO PREVENT FROST HEAVE.) To construct a three story apartment building having a total of 76 dwelling units (24 units 1st story, 26 units 2nd story, and 26 units 3rd story). The 1st story will have a 1,630 square foot storage area with 21 storage units. The interior court on the 1st story will be used for assembly purposes with the egress system passing through the building and sharing the egress system that serves the 1st story apartments. The 1-hr corridors will be enclosed and conditioned and the 1-hr exterior stairways on all stories will be open to the outside. The total floor area of this building is about 81,567 square feet (about 27,189 square feet each story). For building area reasons, this building is divided by a 2-hr fire wall, each side having about 13,550 square feet per story. All ground floor units are required to comply as Type B dwelling units. Because this building does not have an elevator, none of the units located on the 2nd and 3rd stories are regulated for accessibility to the disabled. Work is to include 2-hr fire walls, interior nonbearing walls, 1-hr bearing walls, 1-hr roof-ceiling assemblies, 1-hr floor-ceiling assemblies, 1-hr dwelling unit separations (fire partitions and horizontal assemblies), attic insulation, interior doors, exterior windows and doors, insulated exterior walls, “Hardi-board” exterior siding, exterior manufactured stone wainscot, composition roof shingles, membrane roof coverings for flat roofs, 1-hr common corridors, 1-hr common exterior stairways, draftstops in floors and attics, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, wood floor trusses, wood roof trusses, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. The designs for the roof trusses and floor trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/27/20171/30/20171/30/2017PPASS
DetailsJim Storey
cory Phone #: ###-####
FIRE-Final Inspection1/30/20171/30/20171/30/2017APASS
DetailsJim Page
Final life fire safety inspection passed/complete
BLD-Aging Inspection12/27/201612/27/201612/27/2016 DONE
DetailsJim Storey
BLD-Final10/25/201610/28/201610/28/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Final Inspection10/27/201610/28/201610/28/2016APART
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current insepction tags. Partial final for life fire safety complete, permit will stay in issued status until clubhouse FIR permit is complete, all remote fire panels report to clubhouse panel. After clubhouse FIR permit is finalized then this permit can be finalized.
FIRE-Final Inspection10/25/201610/27/201610/27/2016PCANC
DetailsJim Page
Inspection request rescheduled for 28OCT2016 per conversation with Corey, Phone #: ###-####.
FIRE-Final Inspection10/27/201610/27/201610/27/2016ACANC
DetailsJim Page
Corey ###-####
BLD-Aging Inspection10/7/201610/7/201610/10/2016 PASS
DetailsJim Storey
wip
BLD-Ceiling Grid Inspection7/5/20167/5/20167/7/2016PPASS
DetailsPhil Shearer
First floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection7/5/20167/6/20167/6/2016APASS
DetailsPhil Shearer
First floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection7/5/20167/5/20167/5/2016PCANC
DetailsDave Hannah
First floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith out of time
BLD-Conference7/1/20167/1/20167/1/2016PPART
DetailsJim Storey
L1 bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmithc/n on site
BLD-Ceiling Grid Inspection6/29/20166/30/20166/30/2016APASS
DetailsJim Storey
Second floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection6/28/20166/29/20166/29/2016PPART
DetailsJim Storey
Second floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n
BLD-Other6/24/20166/27/20166/27/2016PPART
DetailsJim Storey
Intown B1 South, Level 3 bathroom drop ceilings. Inspection requested via web by Kevin Honeycutt fire spk not done all others ok
BLD-Ceiling Grid Inspection5/31/20166/1/20166/1/2016APASS
DetailsJim Storey
Second floor RC inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in5/26/20165/26/20165/26/2016PPASS
DetailsJim Storey
First floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in5/23/20165/24/20165/24/2016APASS
DetailsJim Storey
Second floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in5/20/20165/23/20165/23/2016APART
DetailsJim Storey
Second floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
BLD-Framing/Rough-in5/20/20165/20/20165/20/2016PDEFR
DetailsJim Storey
Second floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmithout of time
BLD-Framing/Rough-in5/18/20165/19/20165/19/2016PPASS
DetailsJim Storey
Re inspect third floor framing for cover Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in5/17/20165/18/20165/18/2016APART
DetailsJim Storey
Third floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted ok to rc
BLD-Wall Bracing2/12/20162/16/20162/16/2016APASS
DetailsJim Storey
Second and third floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing1/28/20161/29/20161/29/2016PPASS
DetailsJim Storey
First floor sheer and roof sheer on south half Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Concrete10/9/201510/9/201510/9/2015PPASS
DetailsJim Storey
Concrete reinforcement inspection. Concrete to be onsite Monday at 7:30am. Inspection requested via web by Corey Hockersmith placed with si
BLD-Foundation7/7/20157/9/20157/9/2015APASS
DetailsJim Storey
Concrete at 9:30am Phone #: ###-#### Inspection requested via web by Corey Hockersmith i on sites
BLD-Foundation7/2/20157/6/20157/6/2015APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmithsouth side walls bar ok
BLD-Footing6/29/20156/30/20156/30/2015APASS
DetailsJim Storey
Pouring the remainder of exterior footing and all of interior courtyard stem wall. Phone #: ###-#### Inspection requested via web by Corey Hockersmith si on site /rebar ok
BLD-Footing6/24/20156/26/20156/26/2015APART
DetailsJim Storey
Concrete at 12:30 Phone #: ###-#### Inspection requested via web by Corey Hockersmithplaced w/si
BLD-Footing6/23/20156/24/20156/24/2015ACANC
DetailsJim Storey
concrete on site at 12:30 Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Footing6/22/20156/23/20156/23/2015APASS
DetailsJim Storey
concrete to be on site at 12:30 Phone #: ###-#### Inspection requested via web by Corey Hockersmith