BLD-Final | 1/27/2017 | 1/30/2017 | 1/30/2017 | P | PASS |
Jim Storey
|
|
|
cory Phone #: ###-####
|
FIRE-Final Inspection | 1/30/2017 | 1/30/2017 | 1/30/2017 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection passed/complete
|
BLD-Aging Inspection | 12/27/2016 | 12/27/2016 | 12/27/2016 | | DONE |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 10/27/2016 | 10/28/2016 | 10/28/2016 | A | PART |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current insepction tags. Partial final for life fire safety complete, permit will stay in issued status until clubhouse FIR permit is complete, all remote fire panels report to clubhouse panel. After clubhouse FIR permit is finalized then this permit can be finalized.
|
BLD-Final | 10/25/2016 | 10/28/2016 | 10/28/2016 | P | DONE |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith
ok temp per jim storey
|
FIRE-Final Inspection | 10/25/2016 | 10/27/2016 | 10/27/2016 | P | CANC |
Jim Page
|
|
|
Inspection request rescheduled for 28OCT2016 per conversation with Corey, Phone #: ###-####.
|
BLD-Wall cover | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | PART |
Jim Storey
|
|
|
First, second and third floor plumbing penetrations in 1 hour fire wall Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
|
BLD-Other | 8/2/2016 | 8/3/2016 | 8/3/2016 | P | DEFR |
Jim Storey
|
|
|
First, second and third floor plumbing penetrations in 1 hour fire wall Phone #: ###-#### Inspection requested via web by Corey Hockersmith rolled to am out of time
|
BLD-Other | 6/27/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Jim Storey
|
|
|
Third floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Jim Storey
|
|
|
Third floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Jim Storey
|
|
|
Second floor bathroom ceiling fur downs Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | FAIL |
Jim Storey
|
|
|
RC third floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | PASS |
Jim Storey
|
|
|
First floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/23/2016 | 5/24/2016 | 5/23/2016 | A | CANC |
Jim Storey
|
|
|
First floor bathroom ceiling grid Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/20/2016 | 5/23/2016 | 5/23/2016 | P | CANC |
Jim Storey
|
|
|
First floor bathroom ceiling lids Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 5/18/2016 | 5/20/2016 | 5/20/2016 | P | CANC |
Jim Storey
|
|
|
First floor bathroom ceiling drops Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Wall cover | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Jim Storey
|
|
|
RC ceiling third floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 4/29/2016 | 5/2/2016 | 5/2/2016 | A | PASS |
Jim Storey
|
|
|
RC ceiling grid Second and third floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 4/21/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Jim Storey
|
|
|
First floor RC inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 4/20/2016 | 4/21/2016 | 4/21/2016 | P | PART |
Jim Storey
|
|
|
Second and third floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Conference | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | PART |
Jim Storey
|
|
|
First floor re inspect. Second and Third floor framing inspection. Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n on site
|
BLD-Conference | 4/15/2016 | 4/18/2016 | 4/18/2016 | A | CANC |
Jim Storey
|
|
|
Framing inspection first floor Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Framing/Rough-in | 4/11/2016 | 4/13/2016 | 4/13/2016 | A | PART |
Jim Storey
|
|
|
First floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n on site
|
BLD-Wall Bracing | 3/10/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Jim Storey
|
|
|
First and second floor sheer both halves. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall Bracing | 2/4/2016 | 2/5/2016 | 2/5/2016 | A | PASS |
Jim Storey
|
|
|
Roof sheer and strap detail Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|