BLD-Final | 4/10/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Mike Jordan
|
|
|
Doug Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 4/8/2015 | 4/9/2015 | 4/9/2015 | A | FAIL |
Mike Jordan
|
|
|
doug Phone #: ###-####. Need to get shell and core signed off, open mech and fire permits.
|
FIRE-Final Inspection | 4/7/2015 | 4/9/2015 | 4/8/2015 | A | CANC |
Troy Cobbley
|
|
|
Overbooked. Rescheduled for tomorrow morning
|
FIRE-Conference | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | DONE |
Troy Cobbley
|
|
|
Doug and I went over fire dept signage
|
BLD-Other | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | PASS |
Mike Jordan
|
|
|
Sheeting //Doug Phone #: ###-####. Remainder of storefront framing and sheathing (GlassRoc). Ok.
|
BLD-Wall cover | 3/6/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Phil Shearer
|
|
|
Doug Phone #: ###-####
|
BLD-Energy code compliance | 2/26/2015 | 2/26/2015 | 2/26/2015 | P | PASS |
Mike Jordan
|
|
|
Late PM - Doug Phone #: ###-####
|
FIRE-Conference | 2/25/2015 | 2/25/2015 | 2/25/2015 | P | DONE |
Troy Cobbley
|
|
|
Doug and I talked of options for the exterior soffit such as sprinklers or fire stopping to 160 cubic feet
|
BLD-Framing/Rough-in | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Mike Jordan
|
|
|
Doug Phone #: ###-####. Interior steel stud framed walls ok.
|