Description
(INVOLTA DATA CENTER) Plan Modification 12-11-14 Customer rental office space that was shown on the original plans will now have a celing grid, carprt, lighting and power. **ajs**This submittal is for tenant improvement construction permit. Civil and Structural Footing/Foundation/Steel packages were previously submitted and approved under separate permits.

Project is for a new, single-story, 31,460 square foot data center and office tenant, with future 15,400 square foot Phase 2 (to be permitted separately at future date). This building will provide secure data storage for multiple customers. The facility will be staffed 24 hours a day, 7 days a week. Work to include interior noncombustible partition walls and interior build out with plumbing, mechanical and electrical per approved plans. Interior finish shall meet IBC chapter 8. Building is provided with ADA restrooms and drinking fountain. This building has office space and server area with room designed for future expansion. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/3/20153/4/20153/4/2015APASS
DetailsJim Sly
Berny-zoning inspection scheduled for 10:00 so can you please go out after that for the final Phone #: ###-####
Zoning approved ........OK for Perm Occ.
BLD-Final3/3/20153/3/20153/3/2015PNR
DetailsJim Sly
Burrney Phone #: ###-####
Need to verify Zoning perm occ.
BLD-Final1/26/20151/27/20151/27/2015APART
DetailsMike Jordan
Bernie Phone #: ###-####. All issues resolved. Will be ok for perm occ. once zoning signs pem.
BLD-Final1/16/20151/16/20151/16/2015APART
DetailsMike Jordan
ok for temp occ. Waiting for new ADA signage.
BLD-Final1/13/20151/14/20151/14/2015AFAIL
DetailsMike Jordan
Bernie or ###-#### Jeremiah Phone #: ###-####. Provide special inspection report, post bond. Provide ADA compliant restroom signs.
FIRE-Final Inspection1/12/20151/13/20151/13/2015APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection1/8/20151/9/20151/9/2015AFAIL
DetailsTroy Cobbley
Need approval from plan review for the lighting calculations, need battery room signage still, need spill clean up documentation as discussed, need riser room signage still, need emergency generator certification.
FIRE-Final Inspection12/17/201412/18/201412/18/2014PFAIL
DetailsTroy Cobbley
Went over life safety requirements with owner and general contractor. Need exit discharge lighting, Man Trap door operation approved, fire extinguishers verified, hydrant location verified, gate width verifed, emergency generator certification, need electrical room signs, battery room signs, riser room signage, fire dept access signage, need address, need project related fire alarm and fire sprinkler permits finaled.
FIRE-Final Inspection12/17/201412/17/201412/18/2014PFAIL
DetailsTroy Cobbley
Started life safety inspection. Missing all of the small documents. I noted problems with exit discharge lighting and access controled egress locks. This was only a partial inspection.
BLD-Ceiling Grid Inspection12/17/201412/17/201412/17/2014PPASS
DetailsMike Jordan
BLD-Ceiling Grid Inspection11/20/201411/20/201411/20/2014PPASS
DetailsJim Sly
jason Phone #: ###-####
BLD-Framing/Rough-in10/22/201410/23/201410/23/2014PPASS
DetailsMike Jordan
Jason Phone #: ###-####. soffits and hardlids ok.
BLD-Framing/Rough-in9/26/20149/29/20149/29/2014ACANC
DetailsMike Jordan
Berne Phone #: ###-####. No inspection needed at this time.
BLD-Framing/Rough-in9/26/20149/26/20149/26/2014PPASS
DetailsJim Sly
BLD-Conference9/25/20149/26/20149/26/2014PPASS
DetailsJim Sly
Framing inspection for office area Phone #: ###-#### Inspection requested via web by Berne Hotchkiss
BLD-Conference9/16/20149/16/20149/16/2014ACANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Berne Hotchkiss
BLD-Framing/Rough-in9/16/20149/16/20149/16/2014APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Berne Hotchkiss. ok to start sheeting on exterior side of exterior walls only. Contractor to get clarification from structural engineer regarding the horizontal bridging at 5 ft and 4ft on center for all non bearing walls and walls smaller than 4" wide.
BLD-Framing/Rough-in9/12/20149/15/20149/15/2014PPART
DetailsMike Jordan
Bernie Phone #: ###-####. Exterior steel stud walls at south office area wall. Work in progress on remainder of exterior walls.
BLD-Framing/Rough-in9/3/20149/9/20149/9/2014APASS
DetailsMike Jordan
Berney Phone #: ###-####. Interior steel stud walls at data center portion only. Steel steud parapet also ok to shhet on interior side.
BLD-Framing/Rough-in9/2/20149/2/20149/2/2014PPART
DetailsMike Jordan
bernie Phone #: ###-####. Needs MEP inspections first. Reviewed special inspection reoprts to date. Also requested special inspection reports for precast concrete wall panels.