Permit Information
Permit NumberBLD14-01936
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1105 S LA POINTE ST
Project NameWest Sherwood Apartments
Customer NumberBLD14-01937, BLD14-01938
ePlanReviewYes
Description
VISTA EAST (Formerly known as West Sherwood Apartments) - Parking Garage Level Tenant Improvement - To finish for occupancy a 42,000 square foot, one story parking garage with an entry lobby, bicycle storage, trash room, electrical rooms, sprinkler room, storage area and an elevator equipment room. The shell was constructed under permit BLD14-00772. There will be a three story apartment building constructed on top of this parking garage building. This building will be fully fire sprinklered. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/21/201510/22/201510/22/2015APASS
DetailsDave Hannah
Abel Phone #: ###-####
BLD-Aging Inspection9/30/20159/30/20159/30/2015 PEND
DetailsDave Hannah
BLD-Conference7/29/20157/29/20157/29/2015ADONE
DetailsBob Archibald
Confirmed with electrical contractor and engineer that the fire alarm system wiring has been extended to a point within the units and is available for upgrade when necessary to sustain visual notification for rooms occupied by hearing impaired tenants. ICC A117.1-2009 section 1006.2 and 1006.3.
FIRE-Final Inspection7/23/20157/24/20157/24/2015APASS
DetailsJim Page
Temporary occupancy approved for life fire safety, verbally confirmed with electrical contractor that the fire alarm system has capability to sustain visual notification for rooms occupied by hearing impaired tenants. Electrical contractor needs to provide information on heat tape used on fire sprinkler system before final sign off can occur.

*Above item confirmed - 325*
BLD-Final7/23/20157/24/20157/24/2015PPEND
DetailsDave Hannah
Walk for final Phone #: ###-#### Inspection requested via web by Julian Lopez. needs other trades to final
BLD-Ceiling Grid Inspection6/30/20156/30/20156/30/2015PPASS
DetailsDave Hannah
grid and soffit in bike rm Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Energy code compliance5/20/20155/20/20155/20/2015APASS
DetailsDave Hannah
Garage insulation. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Energy code compliance5/18/20155/18/20155/18/2015PPASS
DetailsDave Hannah
garage insulation Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in5/12/20155/13/20155/14/2015PPART
DetailsDave Hannah
Parking garage ceiling Phone #: ###-#### Inspection requested via web by Julian Lopez west half ok to cover
BLD-Energy code compliance5/11/20155/11/20155/11/2015PPASS
DetailsDave Hannah
Lobby. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in5/1/20155/4/20155/4/2015AFAIL
DetailsDave Hannah
Lobby. Phone #: ###-#### Inspection requested via web by Julian Lopez needs to fix fire stopping
BLD-Framing/Rough-in1/22/20151/22/20151/22/2015PDONE
DetailsDave Hannah
BLD-Framing/Rough-in1/21/20151/22/20151/22/2015APART
DetailsDave Hannah
Julian Phone #: ###-#### sheetrock lids in corradors west side second level ok
BLD-Foundation10/15/201410/15/201410/16/2014PPEND
DetailsDave Hannah
Pouring several slabs with thickened footings that have re-bar in them, pouring elevated spa slab with concrete beams and rebar. Concrete is scheduled fro 8:30 am Thursday. MTI will also be inspecting. Phone #: ###-#### Inspection requested via web by Tony Inserra