BLD-Final | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Dave Hannah
|
|
|
Abel Phone #: ###-####
|
BLD-Aging Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 7/29/2015 | 7/29/2015 | 7/29/2015 | A | DONE |
Bob Archibald
|
|
|
Confirmed with electrical contractor and engineer that the fire alarm system wiring has been extended to a point within the units and is available for upgrade when necessary to sustain visual notification for rooms occupied by hearing impaired tenants. ICC A117.1-2009 section 1006.2 and 1006.3.
|
FIRE-Final Inspection | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Jim Page
|
|
|
Temporary occupancy approved for life fire safety, verbally confirmed with electrical contractor that the fire alarm system has capability to sustain visual notification for rooms occupied by hearing impaired tenants. Electrical contractor needs to provide information on heat tape used on fire sprinkler system before final sign off can occur.
*Above item confirmed - 325*
|
BLD-Final | 7/23/2015 | 7/24/2015 | 7/24/2015 | P | PEND |
Dave Hannah
|
|
|
Walk for final Phone #: ###-#### Inspection requested via web by Julian Lopez. needs other trades to final
|
BLD-Ceiling Grid Inspection | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Dave Hannah
|
|
|
grid and soffit in bike rm Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 5/20/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Dave Hannah
|
|
|
Garage insulation. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PASS |
Dave Hannah
|
|
|
garage insulation Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 5/12/2015 | 5/13/2015 | 5/14/2015 | P | PART |
Dave Hannah
|
|
|
Parking garage ceiling Phone #: ###-#### Inspection requested via web by Julian Lopez west half ok to cover
|
BLD-Energy code compliance | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Dave Hannah
|
|
|
Lobby. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 5/1/2015 | 5/4/2015 | 5/4/2015 | A | FAIL |
Dave Hannah
|
|
|
Lobby. Phone #: ###-#### Inspection requested via web by Julian Lopez needs to fix fire stopping
|
BLD-Framing/Rough-in | 1/22/2015 | 1/22/2015 | 1/22/2015 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/21/2015 | 1/22/2015 | 1/22/2015 | A | PART |
Dave Hannah
|
|
|
Julian Phone #: ###-#### sheetrock lids in corradors west side second level ok
|
BLD-Foundation | 10/15/2014 | 10/15/2014 | 10/16/2014 | P | PEND |
Dave Hannah
|
|
|
Pouring several slabs with thickened footings that have re-bar in them, pouring elevated spa slab with concrete beams and rebar. Concrete is scheduled fro 8:30 am Thursday. MTI will also be inspecting. Phone #: ###-#### Inspection requested via web by Tony Inserra
|