BLD-Final | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Dave Hannah
|
|
|
Abel Phone #: ###-####
|
BLD-Aging Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PASS |
Dave Hannah
|
|
|
Conference Phone #: ###-#### Inspection requested via web by Julian Lopez
|
FIRE-Final Inspection | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PART |
Thomas Walsh
|
|
|
Inspection of newly added exit signs needed to improve ID of egress to exits - all floors, and the clubhouse. All exit signs are now adequate. Only pending issues are EVAC signs posted, and final signoff of fire sprinklers and fire alarm system.
|
BLD-Conference | 7/29/2015 | 7/29/2015 | 7/29/2015 | A | DONE |
Bob Archibald
|
|
|
Confirmed with electrical contractor and engineer that the fire alarm system wiring has been extended to a point within the units and is available for upgrade when necessary to sustain visual notification for rooms occupied by hearing impaired tenants. ICC A117.1-2009 section 1006.2 and 1006.3.
|
FIRE-Final Inspection | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Jim Page
|
|
|
*****10-27-15 as per Scott A. all fire life inspections have passed and ready for perm c of o****Temporary occupancy approved for life fire safety, verbally confirmed with electrical contractor that the fire alarm system has capability to sustain visual notification for rooms occupied by hearing impaired tenants. Electrical contractor needs to provide information on heat tape used on fire sprinkler system before final sign off can occur.
|
BLD-Final | 7/23/2015 | 7/24/2015 | 7/24/2015 | P | PEND |
Dave Hannah
|
|
|
Walk building for final. Phone #: ###-#### Inspection requested via web by Julian Lopez. Needs other trades ot go perm occ needs to install perm signage, type A ada units need to meet ansi 117.1 chapter 10 section 1006. ok for temp occ.
|
BLD-Other | 7/20/2015 | 7/20/2015 | 7/21/2015 | P | PEND |
Dave Hannah
|
|
|
Life safety. This would be for Tom. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
FIRE-Final Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 | P | FAIL |
Thomas Walsh
|
|
|
Called in for a fire/life-safety inspection. Started with exit signage and emergency egress lighting test, but noted too many units not operating properly, including some exit signs that batteries were not charged, and many EM lights not working. Contractor was asked to pretest all EM lights and exit signs prior to rescheduling another inspection. Many of the stairs are still under flooring work and many were not accessible.
|
BLD-Ceiling Grid Inspection | 6/16/2015 | 6/17/2015 | 6/17/2015 | A | PASS |
Dave Hannah
|
|
|
Corridor and ceiling grid Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | NR |
Mike Jordan
|
|
|
Corridor Fire caulking and grid inspection Phone #: ###-#### Inspection requested via web by Julian Lopez. 2nd floor, west and northcorridors, complete fire caulking and provide UL rated assembly for low voltage exiting the smurf tubes and steel conduits.
|
BLD-Conference | 5/8/2015 | 5/8/2015 | 5/11/2015 | P | PASS |
Dave Hannah
|
|
|
Stairwell fire rating. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 4/24/2015 | 4/24/2015 | 4/24/2015 | P | PASS |
Dave Hannah
|
|
|
level 4 fire caulk inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Other | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | NR |
Dave Hannah
|
|
|
level 4 fire caulk inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 4/2/2015 | 4/2/2015 | 4/3/2015 | P | PASS |
Dave Hannah
|
|
|
Level 4 Phone #: ###-#### Inspection requested via web by Julian Lopez
|
FIRE-Conference | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | DONE |
Forrest France
|
|
|
Regarding project related fire sprinkler work.
|
BLD-Energy code compliance | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PASS |
Dave Hannah
|
|
|
Area 2 level 3 check fire caulking at soffit. Check stair well drywall. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 3/26/2015 | 3/26/2015 | 3/27/2015 | P | PART |
Dave Hannah
|
|
|
Area 2 level 4 framing Phone #: ###-#### Inspection requested via web by Julian Lopezok to insulate ceiling
|
BLD-Energy code compliance | 3/18/2015 | 3/18/2015 | 3/19/2015 | P | PASS |
Dave Hannah
|
|
|
Area 2 level 2 inspect plumbing fire caulking in soffits. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 3/16/2015 | 3/17/2015 | 3/17/2015 | A | PASS |
Dave Hannah
|
|
|
Area 2 lvl 4. rest of lvl 3 inspection. Also inspect lvl 4 shower pan fire caulking. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 3/12/2015 | 3/12/2015 | 3/13/2015 | P | PASS |
Dave Hannah
|
|
|
Area 2 lvl 3 insulation. Shower pan fire caulk area 2 lvl 4. Area 2 lvl 4 corridor insulation. South west stair wall framing area 2 lvl 4. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 3/12/2015 | 3/12/2015 | 3/12/2015 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 3/11/2015 | 3/11/2015 | 3/11/2015 | A | PASS |
Dave Hannah
|
|
|
Area 2 lvl 3.insulation and check shower pan fire caulking. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 3/10/2015 | 3/10/2015 | 3/11/2015 | A | PASS |
Dave Hannah
|
|
|
Level 3 partial - Julian ###-####
|
BLD-Framing/Rough-in | 3/10/2015 | 3/10/2015 | 3/11/2015 | A | PART |
Dave Hannah
|
|
|
dywall, taping & fire caulking - Julian Phone #: ###-####
|
BLD-Framing/Rough-in | 3/9/2015 | 3/9/2015 | 3/10/2015 | P | PART |
Dave Hannah
|
|
|
dry wall taping & fire wall Julian ###-####
|
BLD-Framing/Rough-in | 3/9/2015 | 3/9/2015 | 3/10/2015 | A | PASS |
Dave Hannah
|
|
|
Level 4 exterior walls and corridor Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 3/6/2015 | 3/6/2015 | 3/6/2015 | P | CANC |
Dave Hannah
|
|
|
Exterior wall framing lvl 4. Corridor fire caulk Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 3/4/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Dave Hannah
|
|
|
Level 3 framing Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 3/2/2015 | 3/3/2015 | 3/4/2015 | A | PART |
Dave Hannah
|
|
|
Framing lvl3 includes corridors. Phone #: ###-#### Inspection requested via web by Julian Lopez ok to insulate ext wall and ceiling only
|
BLD-Framing/Rough-in | 2/25/2015 | 2/25/2015 | 2/26/2015 | A | PART |
Dave Hannah
|
|
|
Lvl 2 framing lvl 3 outer walls. Phone #: ###-#### Inspection requested via web by Julian Lopez rooms 221 theu 228 ok to cover.
|
BLD-Framing/Rough-in | 2/24/2015 | 2/24/2015 | 2/25/2015 | P | PART |
Dave Hannah
|
|
|
Lvl 2 framing lvl 3 outer walls. Phone #: ###-#### Inspection requested via web by Julian Lopez 3rd floor ok to insulate ext walls
|
BLD-Framing/Rough-in | 2/20/2015 | 2/23/2015 | 2/24/2015 | A | NR |
Dave Hannah
|
|
|
Frame rough in. lvl 2.. Outer walls lvl 3. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PART |
Jim Storey
|
|
|
Inspect rough frame lvl 2. Inspect drywall on lvl 4. Look at lvl 1 soffit Phone #: ###-#### Inspection requested via web by Julian Lopezinsulation 2nd floor coridor ok gyp 3 layer ok/ interior poduim soffit ok// exterior soffit 3 hr not extending thru soffit. rfi.
|
BLD-Conference | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PART |
Dave Hannah
|
|
|
Framing inspection level 2 outer walls. Phone #: ###-#### Inspection requested via web by Julian Lopez ok to insulate ext walls.
|
BLD-Conference | 2/17/2015 | 2/18/2015 | 2/17/2015 | A | CANC |
Dave Hannah
|
|
|
Exterior wall framing inspection. Phone #: ###-#### >> Inspection requested via web by Julian Lopez Inspection cancelled from web by: Julian Lopez
|
BLD-Conference | 2/10/2015 | 2/11/2015 | 2/12/2015 | P | PASS |
Dave Hannah
|
|
|
Consultation Fire caulking and rating Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PART |
Dave Hannah
|
|
|
Check corridor lvl 4 Phone #: ###-#### Inspection requested via web by Julian Lopez ok to insulate ceiling 4th floor corridor.
|
BLD-Wall Bracing | 1/27/2015 | 1/27/2015 | 1/27/2015 | A | PART |
Dave Hannah
|
|
|
ok to cover ext
|
BLD-Conference | 12/22/2014 | 12/23/2014 | 12/23/2014 | A | DONE |
Dave Hannah
|
|
|
I''m requesting a conference at 10;00 am to discuss fire rated issues and concerns with all the subs on the job. Thank you. Phone #: ###-#### Inspection requested via web by Tony Inserra
|
BLD-Other | 12/16/2014 | 12/17/2014 | 12/17/2014 | P | NR |
Dave Hannah
|
|
|
Requesting a roof sheeting OSB nailing inspection. Thanks Tony. Phone #: ###-#### Inspection requested via web by Tony Inserra
|
BLD-Framing/Rough-in | 11/26/2014 | 11/26/2014 | 11/28/2014 | P | PART |
Dave Hannah
|
|
|
We are going to start setting windows they have the vinyl nailing flang, requesting partial sheer nailing inspection. Thank you. Phone #: ###-#### Inspection requested via web by Tony Inserra first floor ok to set windows
|
BLD-Conference | 10/27/2014 | 10/28/2014 | 10/28/2014 | A | PASS |
Dave Hannah
|
|
|
Building conference to talk about rated wall assemblies. Phone #: ###-#### Inspection requested via web by Tony Inserra
|