Permit Information
Permit NumberBLD14-01989
StatusFinaled
Name ARTISAN CUSTOM CARPENTRY AND RENOVA
Site Address 1009 W MAIN ST
Project NameMulligans 2nd Floor Remodel
Customer Number 
ePlanReviewYes
Description
(Mulligans)Remodel former 2nd floor hotel space into event center with bar, new restrooms, elevator, exterior stair and landing, plumbing, upgrade HVAC and electrical, structural upgrades, fire sprinkler and alarm system. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20156/11/20156/11/2015APASS
DetailsJim Sly
Please come as early as possible as the building owners would like to open for business the same evening.
Thank you. Phone #: ###-#### Inspection requested via web by Ryan Allen
OK for Perm Occ.
FIRE-Final Inspection6/9/20156/10/20156/10/2015PPASS
DetailsJim Page
Life fire safety passed/complete
BLD-Framing/Rough-in2/24/20152/25/20152/25/2015PPASS
DetailsDave Hannah
Inspection of framing prior to insulation and sheetrock. Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Framing/Rough-in2/10/20152/11/20152/12/2015APASS
DetailsDave Hannah
inspection of strapping to go under roofing material. After speaking with the roofers around 10 or 1030 would be perfect. Thank you Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Conference1/23/20151/26/20151/26/2015APASS
DetailsDave Hannah
Inspection of exterior of light wells prior to cover. Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Framing/Rough-in1/8/20151/8/20151/8/2015APASS
DetailsDave Hannah
BLD-Conference1/7/20151/8/20151/8/2015APASS
DetailsDave Hannah
Last inspection on floor framing prior to covering Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Framing/Rough-in12/23/201412/26/201412/26/2014APASS
DetailsJim Storey
Inspection on third portion of floor framing Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Framing/Rough-in12/9/201412/9/201412/9/2014PPASS
DetailsDave Hannah
Inspection of 2nd portion of floor framing prior to cover Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Framing/Rough-in12/1/201412/2/201412/2/2014APASS
DetailsDave Hannah
Inspection of floor framing for first portion of second floor remodel prior to cover.
Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Framing/Rough-in11/11/201411/12/201411/12/2014APART
DetailsDave Hannah
Courtesy inspect on columns installed into basement through existing business. Need to cover ASAP. Thanks you. Phone #: ###-#### Inspection requested via web by Ryan Allen ok to cover four front columns on ground floor
BLD-Conference10/30/201410/31/201410/31/2014APASS
DetailsDave Hannah
Ryan Phone #: ###-####