BLD-Final | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Mike Jordan
|
|
|
as per Jason Blais-cnditions have been met and perm C of O can be issued Phone #: ###-####
|
BLD-Aging Inspection | 8/28/2017 | 8/28/2017 | 8/28/2017 | | PEND |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 6/26/2017 | 6/26/2017 | 6/27/2017 | | PEND |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 4/4/2017 | 4/4/2017 | 4/4/2017 | | PEND |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 1/31/2017 | 1/31/2017 | 1/31/2017 | | PEND |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 11/29/2016 | 11/29/2016 | 11/30/2016 | | PEND |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 4/11/2016 | 4/11/2016 | 4/12/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 2/8/2016 | 2/8/2016 | 2/9/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 12/8/2015 | 12/8/2015 | 12/14/2015 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 9/16/2015 | 9/16/2015 | 9/21/2015 | | DEFR |
Phil Shearer
|
|
|
|
BLD-Final | 3/10/2015 | 3/10/2015 | 3/10/2015 | A | PART |
Phil Shearer
|
|
|
Tad Phone #: ###-####. OK for Temp CO
|
BLD-Final | 1/26/2015 | 1/26/2015 | 1/26/2015 | P | CANC |
Phil Shearer
|
|
|
Tyler Phone #: ###-####// wrong permit
|
BLD-Wall Bracing | 12/2/2014 | 12/3/2014 | 12/3/2014 | P | PASS |
Phil Shearer
|
|
|
Tad-interior shear Phone #: ###-####
|
BLD-Energy code compliance | 12/1/2014 | 12/2/2014 | 12/2/2014 | A | PASS |
Phil Shearer
|
|
|
Tad Phone #: ###-####
|
BLD-Energy code compliance | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | FAIL |
Phil Shearer
|
|
|
TAD Phone #: ###-####. Shingles are pushed under flashing and against firelpace chimny. Insulation above the front door needs to be double sided
|
BLD-Energy code compliance | 11/28/2014 | 11/28/2014 | 11/28/2014 | P | NR |
Jim Storey
|
|
|
Tad Phone #: ###-####
|
BLD-Framing/Rough-in | 11/24/2014 | 11/25/2014 | 11/25/2014 | P | PASS |
Phil Shearer
|
|
|
Tad Phone #: ###-####
|
BLD-Framing/Rough-in | 11/19/2014 | 11/20/2014 | 11/20/2014 | A | FAIL |
Mike Jordan
|
|
|
Tad Phone #: ###-####. Provide full height blocking on trusses A5 thru A7, provide the required strapping or 2x4 scabs on piggy back trusses as per sheet D8 from truss engineering. Justify all missid bearing points on trusses A1 thru A7. Ok to insulate, correction notice posted.
|
BLD-Framing/Rough-in | 11/19/2014 | 11/19/2014 | 11/19/2014 | P | NR |
Phil Shearer
|
|
|
Tad Phone #: ###-####
|
BLD-Framing/Rough-in | 11/17/2014 | 11/18/2014 | 11/18/2014 | A | CANC |
Phil Shearer
|
|
|
Tad Phone #: ###-####
|
BLD-Framing/Rough-in | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PART |
Phil Shearer
|
|
|
Thad Phone #: ###-####. Truss clips
|
BLD-Wall Bracing | 10/22/2014 | 10/23/2014 | 10/23/2014 | A | PASS |
Phil Shearer
|
|
|
Ron Phone #: ###-####
|
BLD-Wall Bracing | 10/21/2014 | 10/22/2014 | 10/22/2014 | A | NR |
Phil Shearer
|
|
|
John call for gate code Phone #: ###-####
|
BLD-Other | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | FAIL |
Bill VanDegrift
|
|
|
1) sections 313.3 and 701 of the Idaho State Plumbing code require piping under buildings to be of approved material.
2) Remove and replace existing water and sewer piping with approved material.
3) Review and approval from Idaho Department of Environemtial Quality is required prior to any piping replacement.
|
BLD-Foundation | 9/9/2014 | 9/10/2014 | 9/10/2014 | P | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 9/8/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. There were no markted property lines. The foundation has min of ten feet from other foundations.
|