BLD-Final | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | NH |
Jim Sly
|
|
|
Sara Phone #: ###-#### No Access.......Called Sara and left mssg to recall for insp.
|
BLD-Final | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PEND |
Tony Young
|
|
|
Sara Phone #: ###-####
|
BLD-Final | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PEND |
Tony Young
|
|
|
Sara Phone #: ###-####,, need zoning
|
BLD-Final | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | NR |
Tony Young
|
|
|
Sara Phone #: ###-####,, needs historical
|
BLD-Wall Bracing | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-#### Garage framing
|
BLD-Footing | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####,, appears to be located on lot per reviewed plans,, ftg is monolithic
|
BLD-Energy code compliance | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | PASS |
Tony Young
|
|
|
Sarah Kunz Phone #: ###-####
|
BLD-Framing/Rough-in | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Jim Sly
|
|
|
Brandon Phone #: ###-####-call for access
|
BLD-Wall Bracing | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | PART |
Tony Young
|
|
|
Partial only - Jim Phone #: ###-####,, roof ok to cover
|
BLD-Foundation | 8/13/2014 | 8/14/2014 | 8/15/2014 | A | PASS |
Dave Hannah
|
|
|
Roddy Phone #: ###-#### this was a footing inspection
|
BLD-Foundation | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PART |
Tony Young
|
|
|
Shawn-wall-pour time 3:30 Phone #: ###-####
|