DOC - Permit Finaled | | | 11/21/2016 | | DONE |
|
|
|
Final inspection passed 11-19-16
|
BLD-Final | 11/15/2016 | 11/15/2016 | 11/19/2016 | P | DONE |
Dave Hannah
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Final | 11/17/2016 | 11/18/2016 | 11/19/2016 | P | PASS |
Dave Hannah
|
|
|
Building final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/15/2016 | P | PASS |
Jim Page
|
|
|
Fial life fire safety inspection passed/complete
|
BLD-Final | 11/8/2016 | 11/10/2016 | 11/9/2016 | A | CANC |
Dave Hannah
|
|
|
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
|
BLD-Final | 10/28/2016 | 10/31/2016 | 11/1/2016 | P | NR |
Dave Hannah
|
|
|
Final after Fire/Life/Safety inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
FIRE-Final Inspection | 10/28/2016 | 10/31/2016 | 10/31/2016 | A | PASS |
Katie Marron
|
|
|
No inspection required. Foundation permit. No changes to FD Access or hydrants.
|
BLD-Aging Inspection | 8/25/2016 | 8/25/2016 | 8/30/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/24/2016 | 8/24/2016 | 8/30/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Wall cover | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Dave Hannah
|
|
|
2 hr assembly in storage room south of utility shaft on 2nd level. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/4/2016 | 4/4/2016 | 4/5/2016 | P | PASS |
Dave Hannah
|
|
|
Envelope inspection on 2nd level hard lid. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 4/1/2016 | 4/4/2016 | 4/4/2016 | P | PEND |
Dave Hannah
|
|
|
2 hr assembly in storage closet south of utility shaft. Phone #: ###-#### Inspection requested via web by Michael Zaccheo issued n/c
|
BLD-Conference | 4/23/2015 | 4/23/2015 | 4/4/2016 | P | CANC |
Dave Hannah
|
|
|
Concern project isn''t being done correctly Inspection cancelled from web by: Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Dave Hannah
|
|
|
Re-inspection fire caulking 2nd level ceiling. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Dave Hannah
|
|
|
Steel stud framing on levels 1 and 2. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | NR |
Dave Hannah
|
|
|
Fire caulking and ceiling fat grid 2nd level. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Foundation | 10/21/2015 | 10/22/2015 | 10/23/2015 | A | PEND |
Dave Hannah
|
|
|
Rebar // Mike Phone #: ###-####ok after spec insp sign off
|
BLD-Conference | 8/21/2015 | 8/24/2015 | 8/24/2015 | A | DONE |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 6/5/2015 | 6/8/2015 | 6/9/2015 | P | PASS |
Dave Hannah
|
|
|
Mike-wall Phone #: ###-####
|
BLD-Footing | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | CANC |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Conference | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Dave Hannah
|
|
|
Mike-please call 10 minutes prior Phone #: ###-####
|
BLD-Conference | 4/14/2015 | 4/15/2015 | 4/15/2015 | A | DONE |
Dave Hannah
|
|
|
MIke Phone #: ###-####
|