BLD-Final | 8/31/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Dave Hannah
|
|
|
Victoria Phone #: ###-####
|
FIRE-Final Inspection | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
Victoria Phone #: ###-####
|
BLD-Conference | 1/19/2017 | 1/23/2017 | 1/24/2017 | P | PASS |
Dave Hannah
|
|
|
To review egress path for Annex level 4 terrace.. Phone #: ###-#### Inspection requested via web by Joe Borelli
|
FIRE-Conference | 1/19/2017 | 1/23/2017 | 1/23/2017 | P | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Wall cover | 1/17/2017 | 1/18/2017 | 1/20/2017 | P | PART |
Dave Hannah
|
|
|
Level 1 wellness center. Rated standpipe. cover inspection. Will be complete at 2:00pm. Call on arrival. Phone #: ###-#### Inspection requested via web by Jon Pederson needs to move duct work out of shaft ok to cover the rest
|
BLD-Wall cover | 1/5/2017 | 1/5/2017 | 1/5/2017 | P | PASS |
Dave Hannah
|
|
|
stair 1 rated wall. levels 2-6. Shaft enclosure at stand pipe levels 2,3,4. Phone #: ###-#### Inspection requested via web by Jon Pederson stair tower 2-6 ok standpipe on 3ok ok to keep working on the rest
|
BLD-Wall cover | 1/4/2017 | 1/4/2017 | 1/5/2017 | P | PART |
Dave Hannah
|
|
|
rated stand pipe. rated wall around stand pipe. office, stack 2. level 1-9 Phone #: ###-#### Inspection requested via web by Jon Pederson 3rd flloor ok
|
BLD-Wall cover | 12/29/2016 | 12/29/2016 | 12/29/2016 | P | CANC |
Dave Hannah
|
|
|
level 7 ceiling inspection at bathrooms. for drywall cover. Phone #: ###-#### Inspection requested via web by Jon Pederson
|
BLD-Wall cover | 12/28/2016 | 12/28/2016 | 12/28/2016 | A | PASS |
Dave Hannah
|
|
|
Shaft at bathroom level 5 for drywall cover. Bathroom top out at shaft level 6 for cover. Call when on site. Phone #: ###-#### Inspection requested via web by Jon Pederson
|
BLD-Wall cover | 12/23/2016 | 12/27/2016 | 12/27/2016 | A | PASS |
Dave Hannah
|
|
|
Level 6 Bathroom Shaft Phone #: ###-#### Inspection requested via web by Jon Pederson
|
BLD-Wall cover | 12/21/2016 | 12/22/2016 | 12/22/2016 | P | PASS |
Dave Hannah
|
|
|
Level 4 shaft at bathrooms cover inspection. Level 7 shaft at bathrooms cover inspection. Phone #: ###-#### Inspection requested via web by Jon Pederson
|
BLD-Wall cover | 12/16/2016 | 12/19/2016 | 12/19/2016 | A | PASS |
Dave Hannah
|
|
|
quad core elevator. Levels 4-7 shaft wall cover inspection. Mechanical shaft between bathrooms. levels 2 and 3. Shaft wall cover inspection. Phone #: ###-#### Inspection requested via web by Jon Pederson
|
BLD-Conference | 12/15/2016 | 12/15/2016 | 12/15/2016 | A | PASS |
Dave Hannah
|
|
|
Level 2 and 3 elev quad core lobby. walls and ceilings. shaft wall and cover inspection. Phone #: ###-#### Inspection requested via web by Jon Pederson
|
BLD-Conference | 12/12/2016 | 12/12/2016 | 12/13/2016 | P | PASS |
Dave Hannah
|
|
|
Level 1 elevator shaft. Caulk at electrical was not done. It is being done now by LEA electric. Will be finished at 12:00. please call when on site. Phone #: ###-#### Inspection requested via web by Jon Pederson
|
BLD-Conference | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PART |
Dave Hannah
|
|
|
level 1 quad core elev. lobby. Levels 2 and 3 quad core elev. lobby cover inspoections. Please call when on site. ###-####. Phone #: ###-#### Inspection requested via web by Jon Pederson level one ok to cover
|
BLD-Wall cover | 12/9/2016 | 12/12/2016 | 12/12/2016 | A | PASS |
Dave Hannah
|
|
|
Level 1 satck 1 drywall hard lid cover. Level 1 stack 2 quad core elevator cover. Please call when on site Phone #: ###-#### Inspection requested via web by Jon Pederson
|
FIRE-Conference | 11/19/2016 | 11/21/2016 | 11/22/2016 | P | DONE |
Jim Page
|
|
|
Conference complete
|
FIRE-Alarm Testing | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | DONE |
Jim Page
|
|
|
Fire alarm testing complete for heat and smoke detectors on the simplot world headquarters basement level.
|
FIRE-Final Inspection | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | PART |
Jim Page
|
|
|
Generator transfer for interior emergency/egress lighting tested/inspected for levels 1 through 9, exit signs on level 6 south balcony did not operate under emergency power, will verify operation on a future inspection. Exterior emergency egress lighting and parking level emergency egress/exit lighting will also be verified during a future inspection.
|
BLD-Conference | 10/20/2016 | 10/21/2016 | 10/24/2016 | A | CANC |
Dave Hannah
|
|
|
Requesting conference to review TCO sign off status with fire marshal. Phone #: ###-#### Inspection requested via web by Joe Borelli
|
FIRE-Final Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | CANC |
Jim Page
|
|
|
Inspection request is going to be rescheduled for 24OCT2016.
|
FIRE-Conference | 10/20/2016 | 10/21/2016 | 10/21/2016 | A | DONE |
Jim Page
|
|
|
Fire conference complete, discussed remaining requirements in regards to life safety for TCO.
|
BLD-Final | 10/20/2016 | 10/21/2016 | 10/21/2016 | P | CANC |
Dave Hannah
|
|
|
Requesting TCO sign off for levels 2-7 of office building. Phone #: ###-#### Inspection requested via web by Joe Borelli
|
BLD-Framing/Rough-in | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Final | 10/14/2016 | 10/18/2016 | 10/18/2016 | A | PEND |
Dave Hannah
|
|
|
Requesting TCO for levels 1-9 of SWHQ Office building. Phone #: ###-#### Inspection requested via web by Joe Borelli
|
BLD-Final | 10/8/2016 | 10/10/2016 | 10/10/2016 | A | NR |
Dave Hannah
|
|
|
Requesting TCO walk through for levels 2-4 of SWHQ Office building. Phone #: ###-#### Inspection requested via web by Joe Borelli walk floors needs to finish fire coulking needs signage finish installing office fronts ext
|
BLD-Conference | 10/6/2016 | 10/6/2016 | 10/6/2016 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Ceiling Grid Inspection | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | PEND |
Dave Hannah
|
|
|
john Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2016 | 9/27/2016 | 9/29/2016 | A | PEND |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 9/15/2016 | 9/16/2016 | 9/16/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2016 | 9/12/2016 | 9/12/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Dave Hannah
|
|
|
John-ceiling framing 1st floor exterior Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2016 | 8/17/2016 | 8/17/2016 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. 2nd. floor grid for wood panel in anex building ok.
|
BLD-Framing/Rough-in | 8/8/2016 | 8/9/2016 | 8/10/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### 4th floor anx ceilings/soffits ok to cover
|
BLD-Ceiling Grid Inspection | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### 9th floor
|
BLD-Conference | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | PEND |
Dave Hannah
|
|
|
Victoria Phone #: ###-#### stair tower illumination
|
BLD-Ceiling Grid Inspection | 7/28/2016 | 7/29/2016 | 7/29/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Other | 7/22/2016 | 7/25/2016 | 7/28/2016 | A | PASS |
Dave Hannah
|
|
|
Ceiling cover, annex - John Phone #: ###-####
|
BLD-Wall cover | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Wall cover | 7/18/2016 | 7/19/2016 | 7/20/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### soffit on anx
|
BLD-Other | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Dave Hannah
|
|
|
John-slab edge fire stop Phone #: ###-####
|
BLD-Framing/Rough-in | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Energy code compliance | 6/3/2016 | 6/6/2016 | 6/6/2016 | A | PASS |
Dave Hannah
|
|
|
7th fl exterior - John Phone #: ###-#### 7 and 8th floors ext insulation and 9th floor slab edge ok
|
BLD-Framing/Rough-in | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PART |
Dave Hannah
|
|
|
3rd fl annex - John Phone #: ###-#### shaft around mec ok cover
|
BLD-Framing/Rough-in | 5/27/2016 | 5/31/2016 | 5/31/2016 | A | PASS |
Dave Hannah
|
|
|
John-ceiling-John said inspection has nothing to do with the plan mod that''s in review Phone #: ###-#### second floor ok
|
BLD-Framing/Rough-in | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Dave Hannah
|
|
|
Slab; John Phone #: ###-#### level 4 crossover slabedge fire proofing
|
BLD-Framing/Rough-in | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Dave Hannah
|
|
|
Annex building & Office Bldg - John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/6/2016 | 5/9/2016 | 5/9/2016 | A | PART |
Dave Hannah
|
|
|
Johhn-plan mod not for this inspection Phone #: 371- fourth floor west half ok to cover
|
BLD-Other | 5/6/2016 | 5/9/2016 | 5/9/2016 | A | PART |
Dave Hannah
|
|
|
John-fire stop-plan mod not for this inspection Phone #: ###-#### 9th floor slab edge ok
|
BLD-Energy code compliance | 5/3/2016 | 5/4/2016 | 5/5/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### second floor stack 1 and 2 walls ok
|
BLD-Energy code compliance | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### enerdy not ready but framing on 6th floor ok
|
BLD-Other | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | PASS |
Dave Hannah
|
|
|
Fire stop // John Phone #: ###-#### level 2 anx splb edge f/p ok
|
BLD-Other | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | PART |
Dave Hannah
|
|
|
Thermoal // John Phone #: ###-#### lev 6 ext insulation ok see plans for area
|
BLD-Ceiling Grid Inspection | 4/20/2016 | 4/21/2016 | 4/25/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### level 5 slab edge f/p ok
|
BLD-Framing/Rough-in | 4/12/2016 | 4/13/2016 | 4/14/2016 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### 5th fl
|
BLD-Energy code compliance | 4/7/2016 | 4/8/2016 | 4/12/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-#### anx ext mec sreen on roof
|
BLD-Energy code compliance | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Dave Hannah
|
|
|
Exterior - John Phone #: ###-#### 5th floor west half
|
BLD-Framing/Rough-in | 3/24/2016 | 3/28/2016 | 3/29/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### 4th floor ok to cover walls
|
BLD-Energy code compliance | 3/22/2016 | 3/23/2016 | 3/24/2016 | A | PASS |
Dave Hannah
|
|
|
Insulation // John Phone #: ###-#### stack 2-3 floor 5 slab edge fire safing and floor 4 insulation ok
|
BLD-Framing/Rough-in | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | NR |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | 3/17/2016 | P | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### second floor restroom ok to cover
|
BLD-Framing/Rough-in | 3/14/2016 | 3/15/2016 | 3/17/2016 | A | PEND |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Other | 3/9/2016 | 3/10/2016 | 3/11/2016 | A | PART |
Dave Hannah
|
|
|
John-slab edge-fire stop Phone #: ###-#### 5th floor sw area ok to spray
|
BLD-Conference | 3/7/2016 | 3/8/2016 | 3/10/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### third floor framing int and ext walls shell and core al but for stairs ok to cover
|
BLD-Conference | 2/26/2016 | 2/29/2016 | 3/1/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### 3rd floor ext wall framing inulation and slab edge fire protection pass all but for the east pod
|
BLD-Framing/Rough-in | 2/24/2016 | 2/25/2016 | 2/26/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### third floor restroom area ok to cover
|
BLD-Energy code compliance | 2/23/2016 | 2/24/2016 | 2/24/2016 | A | PART |
Dave Hannah
|
|
|
John-office building Phone #: ###-####third floor ext walls
|
BLD-Framing/Rough-in | 2/19/2016 | 2/22/2016 | 2/22/2016 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 2/18/2016 | 2/19/2016 | 2/19/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### third floor south wing ok to cover walls all but for restrooms
|
BLD-Framing/Rough-in | 2/10/2016 | 2/11/2016 | 2/11/2016 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. South East Interior steel stud framed wall at annex, 2nd floor. All per supplied emgineering. Contractor to verify if clips are nedded or not on the horizontal stiffeners that are placed at 6ft. o.c. Supplied engineering does not show connections to studs.
|
BLD-Framing/Rough-in | 2/3/2016 | 2/4/2016 | 2/6/2016 | A | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 1/25/2016 | 1/26/2016 | 1/27/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 1/15/2016 | 1/19/2016 | 1/20/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### slab edge fire protection
|
BLD-Framing/Rough-in | 1/11/2016 | 1/12/2016 | 1/12/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### safts first floor
|
BLD-Framing/Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 12/8/2015 | 12/9/2015 | 12/9/2015 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### walked site with john looked at bottoms of shafts in second floor
|
BLD-Framing/Rough-in | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | CANC |
Mike Jordan
|
|
|
John Phone #: ###-####. Soffit framing at annex building ok.
|
BLD-Framing/Rough-in | 10/29/2015 | 10/30/2015 | 10/30/2015 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### edge framing on roof
|
BLD-Framing/Rough-in | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 10/8/2015 | 10/9/2015 | 10/14/2015 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### second and third floor elec and mec rooms ok to cover tops
|