Permit Information
Permit NumberBLD14-02173
StatusFinaled
Name HOFFMAN CONSTRUCTION COMPANY
Site Address 1099 W FRONT ST
Project NameSimplot Headquarters Building
Customer Number 
ePlanReviewYes
Description
Simplot Headquarters Office Building - (Shell and Core) - To complete the shell and core phase of a new approximate 306,345 square foot, nine story office building. PLAN MODIFICATION 5-27-15 – Modification submitted to add mechanical screening to top of future lab to accommodate mechanical needed. This modification also covers installation of a new shaft for future mechanical and structural to support lab / mechanical.**TLW** The building area includes the main nine story office building, the fourth and fifth level pedestrian bridge and the five story annex which includes a 3,585 sq. ft. greenhouse on the fifth level. This building will have four outside patios, a 1,220 sq. ft. patio on the sixth floor of the office building, two patios on the seventh floor of the office building, one is 1,415 sq. ft. and one is 2,200 sq. ft. and a 2,900 sq. ft. patio on the fourth floor of the annex. The core areas to be finished are the restrooms, elevator lobbies, stair enclosures, fire command center, entry lobbies, building mechanical and electrical rooms and exterior patio areas. There will be a portion of levels six and seven that will have irrigated vegetated roof areas. The greenhouse structure is a deferred item and has not been reviewed. All exterior walls are deferred and have not been reviewed. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building is being constructed on an existing underground parking garage constructed under BLD12-01330. The superstructure for this building was reviewed and approved under BLD14-01525. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/31/20189/4/20189/4/2018PPASS
DetailsDave Hannah
Victoria Phone #: ###-####
FIRE-Final Inspection8/31/20189/4/20189/4/2018APASS
DetailsJim Page
Final life fire safety inspection complete.

Victoria Phone #: ###-####
BLD-Conference1/19/20171/23/20171/24/2017PPASS
DetailsDave Hannah
To review egress path for Annex level 4 terrace.. Phone #: ###-#### Inspection requested via web by Joe Borelli
FIRE-Conference1/19/20171/23/20171/23/2017PDONE
DetailsJim Page
Fire conference complete
BLD-Wall cover1/17/20171/18/20171/20/2017PPART
DetailsDave Hannah
Level 1 wellness center. Rated standpipe. cover inspection. Will be complete at 2:00pm. Call on arrival. Phone #: ###-#### Inspection requested via web by Jon Pederson needs to move duct work out of shaft ok to cover the rest
BLD-Wall cover1/5/20171/5/20171/5/2017PPASS
DetailsDave Hannah
stair 1 rated wall. levels 2-6. Shaft enclosure at stand pipe levels 2,3,4. Phone #: ###-#### Inspection requested via web by Jon Pederson stair tower 2-6 ok standpipe on 3ok ok to keep working on the rest
BLD-Wall cover1/4/20171/4/20171/5/2017PPART
DetailsDave Hannah
rated stand pipe. rated wall around stand pipe. office, stack 2. level 1-9 Phone #: ###-#### Inspection requested via web by Jon Pederson 3rd flloor ok
BLD-Wall cover12/29/201612/29/201612/29/2016PCANC
DetailsDave Hannah
level 7 ceiling inspection at bathrooms. for drywall cover. Phone #: ###-#### Inspection requested via web by Jon Pederson
BLD-Wall cover12/28/201612/28/201612/28/2016APASS
DetailsDave Hannah
Shaft at bathroom level 5 for drywall cover. Bathroom top out at shaft level 6 for cover. Call when on site. Phone #: ###-#### Inspection requested via web by Jon Pederson
BLD-Wall cover12/23/201612/27/201612/27/2016APASS
DetailsDave Hannah
Level 6 Bathroom Shaft Phone #: ###-#### Inspection requested via web by Jon Pederson
BLD-Wall cover12/21/201612/22/201612/22/2016PPASS
DetailsDave Hannah
Level 4 shaft at bathrooms cover inspection. Level 7 shaft at bathrooms cover inspection. Phone #: ###-#### Inspection requested via web by Jon Pederson
BLD-Wall cover12/16/201612/19/201612/19/2016APASS
DetailsDave Hannah
quad core elevator. Levels 4-7 shaft wall cover inspection. Mechanical shaft between bathrooms. levels 2 and 3. Shaft wall cover inspection. Phone #: ###-#### Inspection requested via web by Jon Pederson
BLD-Conference12/15/201612/15/201612/15/2016APASS
DetailsDave Hannah
Level 2 and 3 elev quad core lobby. walls and ceilings. shaft wall and cover inspection. Phone #: ###-#### Inspection requested via web by Jon Pederson
BLD-Conference12/12/201612/12/201612/13/2016PPASS
DetailsDave Hannah
Level 1 elevator shaft. Caulk at electrical was not done. It is being done now by LEA electric. Will be finished at 12:00. please call when on site. Phone #: ###-#### Inspection requested via web by Jon Pederson
BLD-Conference12/12/201612/13/201612/13/2016APART
DetailsDave Hannah
level 1 quad core elev. lobby. Levels 2 and 3 quad core elev. lobby cover inspoections.
Please call when on site. ###-####. Phone #: ###-#### Inspection requested via web by Jon Pederson level one ok to cover
BLD-Wall cover12/9/201612/12/201612/12/2016APASS
DetailsDave Hannah
Level 1 satck 1 drywall hard lid cover. Level 1 stack 2 quad core elevator cover. Please call when on site Phone #: ###-#### Inspection requested via web by Jon Pederson
FIRE-Conference11/19/201611/21/201611/22/2016PDONE
DetailsJim Page
Conference complete
FIRE-Alarm Testing11/10/201611/14/201611/14/2016ADONE
DetailsJim Page
Fire alarm testing complete for heat and smoke detectors on the simplot world headquarters basement level.
FIRE-Final Inspection10/21/201610/24/201610/24/2016APART
DetailsJim Page
Generator transfer for interior emergency/egress lighting tested/inspected for levels 1 through 9, exit signs on level 6 south balcony did not operate under emergency power, will verify operation on a future inspection. Exterior emergency egress lighting and parking level emergency egress/exit lighting will also be verified during a future inspection.
BLD-Conference10/20/201610/21/201610/24/2016ACANC
DetailsDave Hannah
Requesting conference to review TCO sign off status with fire marshal. Phone #: ###-#### Inspection requested via web by Joe Borelli
FIRE-Final Inspection10/21/201610/21/201610/21/2016PCANC
DetailsJim Page
Inspection request is going to be rescheduled for 24OCT2016.
FIRE-Conference10/20/201610/21/201610/21/2016ADONE
DetailsJim Page
Fire conference complete, discussed remaining requirements in regards to life safety for TCO.
BLD-Final10/20/201610/21/201610/21/2016PCANC
DetailsDave Hannah
Requesting TCO sign off for levels 2-7 of office building. Phone #: ###-#### Inspection requested via web by Joe Borelli
BLD-Framing/Rough-in10/19/201610/20/201610/20/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Final10/14/201610/18/201610/18/2016APEND
DetailsDave Hannah
Requesting TCO for levels 1-9 of SWHQ Office building. Phone #: ###-#### Inspection requested via web by Joe Borelli
BLD-Final10/8/201610/10/201610/10/2016ANR
DetailsDave Hannah
Requesting TCO walk through for levels 2-4 of SWHQ Office building. Phone #: ###-#### Inspection requested via web by Joe Borelli walk floors needs to finish fire coulking needs signage finish installing office fronts ext
BLD-Conference10/6/201610/6/201610/6/2016APASS
DetailsDave Hannah
BLD-Ceiling Grid Inspection10/4/201610/5/201610/5/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in9/28/20169/29/20169/29/2016APEND
DetailsDave Hannah
john Phone #: ###-####
BLD-Framing/Rough-in9/26/20169/27/20169/29/2016APEND
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in9/15/20169/16/20169/16/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in9/9/20169/12/20169/12/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in9/1/20169/2/20169/2/2016APASS
DetailsDave Hannah
John-ceiling framing 1st floor exterior Phone #: ###-####
BLD-Framing/Rough-in8/23/20168/24/20168/24/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in8/16/20168/17/20168/17/2016APASS
DetailsMike Jordan
John Phone #: ###-####. 2nd. floor grid for wood panel in anex building ok.
BLD-Framing/Rough-in8/8/20168/9/20168/10/2016APASS
DetailsDave Hannah
John Phone #: ###-#### 4th floor anx ceilings/soffits ok to cover
BLD-Ceiling Grid Inspection8/9/20168/10/20168/10/2016APASS
DetailsDave Hannah
John Phone #: ###-#### 9th floor
BLD-Conference8/1/20168/2/20168/2/2016APEND
DetailsDave Hannah
Victoria Phone #: ###-#### stair tower illumination
BLD-Ceiling Grid Inspection7/28/20167/29/20167/29/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Other7/22/20167/25/20167/28/2016APASS
DetailsDave Hannah
Ceiling cover, annex - John Phone #: ###-####
BLD-Wall cover7/20/20167/21/20167/21/2016APART
DetailsDave Hannah
John Phone #: ###-####
BLD-Wall cover7/18/20167/19/20167/20/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in7/13/20167/14/20167/14/2016APASS
DetailsDave Hannah
John Phone #: ###-#### soffit on anx
BLD-Other6/21/20166/22/20166/22/2016APASS
DetailsDave Hannah
John-slab edge fire stop Phone #: ###-####
BLD-Framing/Rough-in6/13/20166/14/20166/14/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Energy code compliance6/3/20166/6/20166/6/2016APASS
DetailsDave Hannah
7th fl exterior - John Phone #: ###-#### 7 and 8th floors ext insulation and 9th floor slab edge ok
BLD-Framing/Rough-in6/1/20166/2/20166/2/2016APART
DetailsDave Hannah
3rd fl annex - John Phone #: ###-#### shaft around mec ok cover
BLD-Framing/Rough-in5/27/20165/31/20165/31/2016APASS
DetailsDave Hannah
John-ceiling-John said inspection has nothing to do with the plan mod that''s in review Phone #: ###-#### second floor ok
BLD-Framing/Rough-in5/23/20165/24/20165/24/2016APASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Foundation5/16/20165/17/20165/17/2016APASS
DetailsDave Hannah
Slab; John Phone #: ###-#### level 4 crossover slabedge fire proofing
BLD-Framing/Rough-in5/12/20165/13/20165/13/2016APASS
DetailsDave Hannah
Annex building & Office Bldg - John Phone #: ###-####
BLD-Ceiling Grid Inspection5/6/20165/9/20165/9/2016APART
DetailsDave Hannah
Johhn-plan mod not for this inspection Phone #: 371- fourth floor west half ok to cover
BLD-Other5/6/20165/9/20165/9/2016APART
DetailsDave Hannah
John-fire stop-plan mod not for this inspection Phone #: ###-#### 9th floor slab edge ok
BLD-Energy code compliance5/3/20165/4/20165/5/2016APART
DetailsDave Hannah
John Phone #: ###-#### second floor stack 1 and 2 walls ok
BLD-Energy code compliance4/28/20164/29/20164/29/2016APART
DetailsDave Hannah
John Phone #: ###-#### enerdy not ready but framing on 6th floor ok
BLD-Other4/25/20164/25/20164/25/2016PPASS
DetailsDave Hannah
Fire stop // John Phone #: ###-#### level 2 anx splb edge f/p ok
BLD-Other4/25/20164/25/20164/25/2016PPART
DetailsDave Hannah
Thermoal // John Phone #: ###-#### lev 6 ext insulation ok see plans for area
BLD-Ceiling Grid Inspection4/20/20164/21/20164/25/2016APASS
DetailsDave Hannah
John Phone #: ###-#### level 5 slab edge f/p ok
BLD-Framing/Rough-in4/12/20164/13/20164/14/2016APASS
DetailsDave Hannah
John Phone #: ###-#### 5th fl
BLD-Energy code compliance4/7/20164/8/20164/12/2016APART
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in4/11/20164/12/20164/12/2016APASS
DetailsDave Hannah
Mike Phone #: ###-#### anx ext mec sreen on roof
BLD-Energy code compliance4/4/20164/5/20164/5/2016APASS
DetailsDave Hannah
Exterior - John Phone #: ###-#### 5th floor west half
BLD-Framing/Rough-in3/24/20163/28/20163/29/2016APART
DetailsDave Hannah
John Phone #: ###-#### 4th floor ok to cover walls
BLD-Energy code compliance3/22/20163/23/20163/24/2016APASS
DetailsDave Hannah
Insulation // John Phone #: ###-#### stack 2-3 floor 5 slab edge fire safing and floor 4 insulation ok
BLD-Framing/Rough-in3/18/20163/21/20163/21/2016ANR
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in3/16/20163/16/20163/17/2016PPART
DetailsDave Hannah
john Phone #: ###-#### second floor restroom ok to cover
BLD-Framing/Rough-in3/14/20163/15/20163/17/2016APEND
DetailsDave Hannah
John Phone #: ###-####
BLD-Other3/9/20163/10/20163/11/2016APART
DetailsDave Hannah
John-slab edge-fire stop Phone #: ###-#### 5th floor sw area ok to spray
BLD-Conference3/7/20163/8/20163/10/2016APART
DetailsDave Hannah
John Phone #: ###-#### third floor framing int and ext walls shell and core al but for stairs ok to cover
BLD-Conference2/26/20162/29/20163/1/2016APART
DetailsDave Hannah
John Phone #: ###-#### 3rd floor ext wall framing inulation and slab edge fire protection pass all but for the east pod
BLD-Framing/Rough-in2/24/20162/25/20162/26/2016APART
DetailsDave Hannah
John Phone #: ###-#### third floor restroom area ok to cover
BLD-Energy code compliance2/23/20162/24/20162/24/2016APART
DetailsDave Hannah
John-office building Phone #: ###-####third floor ext walls
BLD-Framing/Rough-in2/19/20162/22/20162/22/2016PPASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in2/18/20162/19/20162/19/2016APART
DetailsDave Hannah
John Phone #: ###-#### third floor south wing ok to cover walls all but for restrooms
BLD-Framing/Rough-in2/10/20162/11/20162/11/2016APASS
DetailsMike Jordan
John Phone #: ###-####. South East Interior steel stud framed wall at annex, 2nd floor. All per supplied emgineering. Contractor to verify if clips are nedded or not on the horizontal stiffeners that are placed at 6ft. o.c. Supplied engineering does not show connections to studs.
BLD-Framing/Rough-in2/3/20162/4/20162/6/2016APART
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Framing/Rough-in1/25/20161/26/20161/27/2016APART
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in1/15/20161/19/20161/20/2016APART
DetailsDave Hannah
John Phone #: ###-#### slab edge fire protection
BLD-Framing/Rough-in1/11/20161/12/20161/12/2016APART
DetailsDave Hannah
John Phone #: ###-#### safts first floor
BLD-Framing/Rough-in1/5/20161/6/20161/6/2016APART
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in12/8/201512/9/201512/9/2015APART
DetailsDave Hannah
John Phone #: ###-#### walked site with john looked at bottoms of shafts in second floor
BLD-Framing/Rough-in11/3/201511/4/201511/4/2015ACANC
DetailsMike Jordan
John Phone #: ###-####. Soffit framing at annex building ok.
BLD-Framing/Rough-in10/29/201510/30/201510/30/2015APART
DetailsDave Hannah
John Phone #: ###-#### edge framing on roof
BLD-Framing/Rough-in10/21/201510/22/201510/22/2015APART
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in10/8/201510/9/201510/14/2015APART
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in9/28/20159/29/20159/29/2015APART
DetailsDave Hannah
John Phone #: ###-#### second and third floor elec and mec rooms ok to cover tops