BLD-Aging Inspection | 1/15/2016 | 1/15/2016 | 1/17/2016 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/14/2016 | 1/14/2016 | 1/15/2016 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 1/15/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 9/1/2015 | 9/2/2015 | 9/2/2015 | A | PASS |
Jim Sly
|
|
|
JOSH Phone #: ###-#### OK per 415.
|
BLD-Final | 8/31/2015 | 9/1/2015 | 9/1/2015 | A | NR |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Final | 8/28/2015 | 8/31/2015 | 8/31/2015 | A | NR |
Tony Young
|
|
|
Josh Phone #: ###-####,, need engineering on glass guardrail,, hillside final,, roof soffit vents
|
BLD-Framing/Rough-in | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####,, patio frame ok,, soffit ok
|
BLD-Other | 4/2/2015 | 4/3/2015 | 4/3/2015 | P | PASS |
Tony Young
|
|
|
soffit/// Josh Phone #: ###-####
|
BLD-Wall Bracing | 4/1/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Tony Young
|
|
|
Shear // Josh Phone #: ###-####,, shear ok
|
BLD-Wall Bracing | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | FAIL |
Jim Storey
|
|
|
Josh Phone #: ###-#### #7 c/n ceilling covered/ plm drain line in soffit not allowed
|
BLD-Energy code compliance | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | PART |
Tony Young
|
|
|
Josh// please call 30min before- inspecting sheet rock in the eaves Phone #: ###-####,, see notes on frame inspection,, energy code ok so far
|
BLD-Framing/Rough-in | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | PART |
Tony Young
|
|
|
Josh// please call 30min before Phone #: ###-####,, ok to sheet rock after sealing up the draft stops,, need to finish correction notice,, soffits need double layer in can light boxes and fire caulked,, plan mod for added porch in review?,, also took out closet in basement room without window well,, still pending plan mod approval on those 2 items
|
BLD-Framing/Rough-in | 3/11/2015 | 3/12/2015 | 3/12/2015 | P | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, correction notice posted
|
BLD-Wall Bracing | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Foundation | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Tony Young
|
|
|
Adam Phone #: ###-####
|
BLD-Footing | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PART |
Tony Young
|
|
|
Adam Phone #: ###-####,, lower ftgs ok
|
BLD-Footing | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | PART |
Tony Young
|
|
|
Adam Phone #: ###-####,, getting forms in place
|
BLD-Foundation | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PART |
Tony Young
|
|
|
Adam Phone #: ###-####,, tall walls,, work in progress
|
BLD-Footing | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PART |
Tony Young
|
|
|
Adam Phone #: ###-####,, rear basement/ retaining ftgs,, work in progress
|
BLD-Footing | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | NR |
Tony Young
|
|
|
Adam Phone #: ###-####,, need soils report
|
BLD-Foundation | 11/6/2014 | 11/6/2014 | 11/6/2014 | P | PEND |
Phil Shearer
|
|
|
Retaining wall rebar/requests 2 pm inspection, pouring at 3 - JR Phone #: ###-#### Retaining wall. Rebar ok as per engineered drawings that the contractor provided. There were not aproved drawing for this the retaining walls.
|
BLD-Foundation | 11/5/2014 | 11/5/2014 | 11/6/2014 | P | PEND |
Phil Shearer
|
|
|
JR-pour time 3:00 Phone #: ###-####. Retaining wall. Rebar ok as per engineered drawings that the contractor provided. There were not aproved drawing for this the retaining walls.
|
BLD-Footing | 11/3/2014 | 11/4/2014 | 11/4/2014 | P | PEND |
Tony Young
|
|
|
JR-pour time 3:00 Phone #: ###-####retaining ftgs,, pending soils
|