BLD-Final | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 2/9/2015 | 2/10/2015 | 2/9/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 2/4/2015 | 2/5/2015 | 2/5/2015 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Thornton
|
FIRE-Final Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | P | FAIL |
Troy Cobbley
|
|
|
Need "FIre Door - Do Not Block" signs at the fire door and the project related fire alarm permit finaled before I can pass the life safety.
|
BLD-Wall cover | 1/9/2015 | 1/9/2015 | 1/10/2015 | P | PASS |
Dave Hannah
|
|
|
Inspect the progress of the West building. Phone #: ###-#### Inspection requested via web by Bob Thornton columns
|
BLD-Wall cover | 12/26/2014 | 12/29/2014 | 12/29/2014 | A | PASS |
Mike Jordan
|
|
|
Progress inspection of the East building electrical room ceiling. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Conference | 12/26/2014 | 12/26/2014 | 12/26/2014 | P | CANC |
Mike Jordan
|
|
|
Inspect the progress of the rated ceiling in the East building electrical room. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
|
BLD-Wall cover | 12/15/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Mike Jordan
|
|
|
Progress inspection of the rated ceiling on the West building Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 12/12/2014 | 12/12/2014 | 12/12/2014 | P | PASS |
Mike Jordan
|
|
|
Progress inspection of the rated ceiling. Phone #: ###-#### Inspection requested via web by Bob Thornton. Work in progress, completed work to this point ok.
|
BLD-Wall cover | 11/12/2014 | 11/13/2014 | 11/13/2014 | A | PART |
Mike Jordan
|
|
|
Please perform a progress inspection of the rated warehouse ceiling. Phone #: ###-#### Inspection requested via web by Bob Thornton. work in progress ok on rated ceiling and column wrap.
|
BLD-Conference | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | PART |
Mike Jordan
|
|
|
Do a progress inspection of the rated warehouse ceiling. Phone #: ###-#### Inspection requested via web by Bob Thornton. Work in progress ok.
|
BLD-Conference | 11/4/2014 | 11/5/2014 | 11/5/2014 | A | PART |
Mike Jordan
|
|
|
Perform progress inspection of 3 hour walls. Perform progress inspection of the 1 hour ceiling. Phone #: ###-#### Inspection requested via web by Bob Thornton. Work in progress, ok.
|
BLD-Wall cover | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Mike Jordan
|
|
|
Inspect the 1st layer on the 3 hour walls Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 10/31/2014 | 11/3/2014 | 11/3/2014 | A | PASS |
Mike Jordan
|
|
|
Inspect the interior 3 hour walls Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 10/14/2014 | 10/14/2014 | 10/14/2014 | P | PASS |
Mike Jordan
|
|
|
Inspect the last 3 hour window infill on the West building. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD-Framing/Rough-in | 10/9/2014 | 10/10/2014 | 10/10/2014 | A | PASS |
Mike Jordan
|
|
|
Look at the 3 hour exterior window infills. Phone #: ###-#### Inspection requested via web by Bob Thornton. 3hr. exterior window infills at prior loading dock location.
|
BLD-Conference | 10/2/2014 | 10/2/2014 | 10/2/2014 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Thornton
|