BLD-Final | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Dave Hannah
|
|
|
Abel Phone #: ###-####
|
BLD-Aging Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 7/29/2015 | 7/29/2015 | 7/29/2015 | A | PASS |
Dave Hannah
|
|
|
Confirmed with electrical contractor and engineer that the fire alarm system wiring has been extended to a point within the units and is available for upgrade when necessary to sustain visual notification for rooms occupied by hearing impaired tenants. ICC A117.1-2009 section 1006.2 and 1006.3.
|
FIRE-Final Inspection | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Jim Page
|
|
|
Temporary occupancy approved for life fire safety, verbally confirmed with electrical contractor that the fire alarm system has capability to sustain visual notification for rooms occupied by hearing impaired tenants. Electrical contractor needs to provide information on heat tape used on fire sprinkler system before final sign off can occur.
*Above item confirmed* - 325
|
BLD-Final | 7/23/2015 | 7/24/2015 | 7/24/2015 | P | PEND |
Dave Hannah
|
|
|
Walk for final Phone #: ###-#### Inspection requested via web by Julian Lopez. Needs other trades ot go perm occ needs to install perm signage, type A ada units need to meet ansi 117.1 chapter 10 section 1006. ok for temp occ.
|
BLD-Conference | 7/14/2015 | 7/14/2015 | 7/15/2015 | P | DONE |
Dave Hannah
|
|
|
Julian Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/17/2015 | 6/17/2015 | 6/18/2015 | P | PASS |
Dave Hannah
|
|
|
ceiling grid level 2 and 3 Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Other | 6/2/2015 | 6/3/2015 | 6/4/2015 | A | PEND |
Dave Hannah
|
|
|
John// fire proofing for cover in Clubhouse Phone #: ###-#### ok after sprc inspection sign off
|
BLD-Energy code compliance | 5/21/2015 | 5/21/2015 | 5/21/2015 | P | PART |
Dave Hannah
|
|
|
Clubhouse Phone #: ###-#### Inspection requested via web by Julian Lopez ok to cover alll but beams
|
BLD-Other | 5/7/2015 | 5/7/2015 | 5/8/2015 | P | PASS |
Dave Hannah
|
|
|
level 4 Soffit inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Other | 5/5/2015 | 5/6/2015 | 5/6/2015 | P | PART |
Dave Hannah
|
|
|
level 3 soffit inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Dave Hannah
|
|
|
Elevator insulation Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 4/16/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Dave Hannah
|
|
|
shear wall level 2,3,4 at south stairwell by clubhouse. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 4/16/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Dave Hannah
|
|
|
Level 2 insulation and shower pan fire caulking. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 4/14/2015 | 4/15/2015 | 4/16/2015 | A | PART |
Dave Hannah
|
|
|
Level 3 and 4 insulation. Shear walls east of stairs Phone #: ###-#### Inspection requested via web by Julian Lopez 4th floor shear ok insulateion 3rd and 4th ok
|
BLD-Energy code compliance | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Dave Hannah
|
|
|
level 3 and 4 shower pan fire caulking inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | PASS |
Dave Hannah
|
|
|
Framing level 2,3 and 4. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | PASS |
Dave Hannah
|
|
|
Framing inspection. Level''s 2, 3, and 4. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 2/25/2015 | 2/26/2015 | 2/26/2015 | A | PART |
Dave Hannah
|
|
|
Level 3 inside exterior framing. Phone #: ###-#### Inspection requested via web by Julian Lopez corridor ceiling and top 2ft ok to cover
|
BLD-Conference | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PART |
Dave Hannah
|
|
|
Framing inspection level 2 outer walls. Phone #: ###-#### Inspection requested via web by Julian Lopez . ok to insulate ext walls.
|
BLD-Framing/Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PART |
Dave Hannah
|
|
|
Check corridor framing lvl4 Phone #: ###-#### Inspection requested via web by Julian Lopez ok to insulate ceiling 4th floor corridor.
|
BLD-Wall Bracing | 1/27/2015 | 1/27/2015 | 1/27/2015 | A | PART |
Dave Hannah
|
|
|
ok to cover ext
|