BLD-Final | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | FAIL |
Mike Jordan
|
|
|
would like call ahead; Sydney Phone #: ###-####.. provide the required energy cert and post. Provide the blower door test result or the 3rd. party airseal inspection report and post. Also need to verify tempered glazing at front door. Correction notice posted.
|
BLD-Energy code compliance | 4/7/2015 | 4/8/2015 | 4/8/2015 | A | PASS |
Mike Jordan
|
|
|
Steven-please call prior Phone #: ###-####
|
BLD-Framing/Rough-in | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | PASS |
Mike Jordan
|
|
|
All framing issues have been resolved.
|
BLD-Energy code compliance | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | FAIL |
Mike Jordan
|
|
|
Insulation // Bob Phone #: ###-####. Provide R30 insulation at 2nd. story floor in garage.
|
BLD-Framing/Rough-in | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | FAIL |
Mike Jordan
|
|
|
Please call ahead for access - Bob Phone #: ###-####. COmplete interior wal bracing, Provide additional truss hangars were missed, nail of all 2 and 3 ply girder trusses, this was completed while on site. Ok to insulate. Squash block at rough sawn lumber.
|
BLD-Wall Bracing | 3/27/2015 | 3/27/2015 | 3/27/2015 | A | PASS |
Mike Jordan
|
|
|
Please call ahead for access - Bob Phone #: ###-####
|
BLD-Foundation | 1/29/2015 | 1/29/2015 | 1/29/2015 | P | PART |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 1/27/2015 | 1/28/2015 | 1/28/2015 | A | PART |
Mike Jordan
|
|
|
Jay Phone #: ###-####. No approved plan on site. Told Jay ok to place, have approved plans for foundation inspection. Any descrencies will be repaired.
|