BLD-Final | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | NR |
Phil Shearer
|
|
|
Justin Phone #: ###-####. Waiting on grading bond
|
BLD-Final | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | NR |
Jim Storey
|
|
|
Please call me before so I can meet you there
Thank you Phone #: ###-#### Inspection requested via web by Justin Ellett no insp. need pw insp.
|
BLD-Footing | 2/29/2016 | 3/1/2016 | 3/1/2016 | P | PASS |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
BLD-Conference | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | PASS |
Phil Shearer
|
|
|
Exterior soffit sheetrock - Justin Phone #: ###-####
|
BLD-Conference | 1/21/2016 | 1/21/2016 | 1/21/2016 | P | NR |
Phil Shearer
|
|
|
Exterior soffit sheetrock - Justin Phone #: ###-####
|
BLD-Conference | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | FAIL |
Phil Shearer
|
|
|
Exterior soffit sheetrock - Justin Phone #: ###-####
|
BLD-Energy code compliance | 1/13/2016 | 1/14/2016 | 1/14/2016 | A | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | PART |
Phil Shearer
|
|
|
Justin Phone #: ###-####. Truss bracing, Fire blocking above fireplace, Screws in connetion at grid 7. OK to insulate.
|
BLD-Conference | 12/15/2015 | 12/16/2015 | 12/16/2015 | A | PASS |
Jim Storey
|
|
|
Justin Phone #: ###-#### insulation at roof above vault ok
|
BLD-Wall Bracing | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Phil Shearer
|
|
|
Justin Phone #: ###-####
|
BLD-Foundation | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 7/8/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. INterior and exterior footings only except at stepped footing areas and retaining wall.
|
BLD-Footing | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | CANC |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|