Permit Information
Permit NumberBLD14-02529
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 815 E PARK BLVD Unit: 300
Project NameFalcon Bldg St. Luke's 3rd FL
Customer Number 
ePlanReviewNo
Description
(ST LUKE'S HEALTH SYSTEM OFFICE – FALCON BLDG – Ste# 300) Remodel for a new office tenant with assembly board room to occupy the entire 12,539 square foot third floor of existing building per approved plans. PLAN MODIFICATION 10-29-14 – Modification submitted to change the materials on the “Fluid Cooler Building” to smooth face CMU from brick (new engineering and details).**TLW** This building was upgraded under BLD06-01825, it was fire sprinklered for story and area increase. Work to include: demolition of existing offices, [construction of new interior non-bearing walls to create 15 individual offices, 2 conference rooms, 2 committee rooms, 1 board room, 2 storage rooms, 1 staging room, IT closet, a waiting room, and related office areas], [construction of new fluid cooler enclosure next to existing building (per engineering)], installation of new chiller on the roof, new mechanical, new electrical, new lighting, new plumbing, installation of new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/3/20154/3/20154/3/2015 PASS
DetailsDave Hannah
FIRE-Final Inspection12/29/201412/30/201412/30/2014APASS
DetailsForrest France
Fire life safety inspection completed acceptable. Three EM lights repaired while on site.
BLD-Final12/29/201412/30/201412/30/2014PPASS
DetailsDave Hannah
Ron Phone #: ###-####
FIRE-Conference12/8/201412/8/201412/8/2014ADONE
DetailsForrest France
Fire sprinkler rough-in okayed for cover.
BLD-Ceiling Grid Inspection11/25/201411/25/201411/26/2014PPEND
DetailsDave Hannah
Ron Phone #: ###-#### ok to install border tile
BLD-Framing/Rough-in10/14/201410/15/201410/15/2014APART
DetailsDave Hannah
Ron Phone #: ###-#### needs arch to resumit plans changing stud spacing from 16 inchs to 24 inchs oc ok to cover after approval