BLD-Final | 1/15/2015 | 1/16/2015 | 1/16/2015 | P | PASS |
Jim Sly
|
|
|
Building Final Inspection - Shane is the superintendent ###-#### Phone #: ###-#### Inspection requested via web by Paul Saucerman
|
DOC - Permit Finaled | 1/16/2015 | 1/16/2015 | 1/16/2015 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 1/15/2015 | 1/16/2015 | 1/16/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Framing/Rough-in | 12/2/2014 | 12/3/2014 | 12/3/2014 | P | PART |
Jim Sly
|
|
|
Shear wall framing inspection / call Dan Lyda at the site if you have any questions ###-#### Phone #: ###-#### Inspection requested via web by Paul Saucerman Exterior shear nailing only OK.
|
BLD-Wall Bracing | 11/21/2014 | 11/25/2014 | 11/25/2014 | P | PART |
Jim Sly
|
|
|
Dan Phone #: ###-#### Roof nailing only......OK.
|
BLD-Other | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PASS |
Jim Sly
|
|
|
Rebar - Don Phone #: ###-#### Wall OK.
|
BLD-Footing | 10/27/2014 | 10/28/2014 | 10/28/2014 | A | PASS |
Jim Sly
|
|
|
late am // Dan ###-#### Verified 21' #3 rebar U fer in footing.
|
BLD-Footing | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | CANC |
Jim Sly
|
|
|
Dan Phone #: ###-####
|
BLD-Footing | 10/23/2014 | 10/27/2014 | 10/27/2014 | A | NR |
Mike Jordan
|
|
|
Dan Phone #: ###-####. Will reschedule for the pm.
|