BLD-Final | 9/22/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 9/22/2015 | 9/23/2015 | 9/23/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 9/17/2015 | 9/18/2015 | 9/18/2015 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the two project related fire sprinkler permits are finaled
|
BLD-Final | 9/17/2015 | 9/18/2015 | 9/18/2015 | P | CANC |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
BLD-Conference | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PEND |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Wants to open courtyard area. Needs zoning, electrical, mech, and public works to ok this area prior to use. Noted that all construction within the courtyard area is completed.
|
FIRE-Conference | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | DONE |
Troy Cobbley
|
|
|
Tom and I went over the location for the "Emergency Stop" sign for the gas valve to the outdoor fire pit. I'm ok for the fire pit area to be used.
|
BLD-Conference | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | CANC |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
FIRE-Conference | 6/25/2015 | 6/26/2015 | 6/29/2015 | A | DONE |
Jim Page
|
|
|
Questioned regarding the location of a fire extinguisher for the outside fire pit, surveyed and verified an acceptable location.
|
BLD-Foundation | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Mike Jordan
|
|
|
Tom-rebar Phone #: ###-####. Column footings for new signs westside of building C.
|
BLD-Footing | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | CANC |
Mike Jordan
|
|
|
rebar Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2015 | 4/30/2015 | 4/30/2015 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Steel stud framing for new headers where existing arches where removed.
|
BLD-Footing | 4/30/2015 | 4/30/2015 | 4/30/2015 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Footing for new columns for new signs, east side of building B.
|