BLD-Final | 8/22/2016 | 8/22/2016 | 8/23/2016 | P | NR |
Mike Jordan
|
|
|
Nacho Phone #: ###-####
|
BLD-Final | 5/9/2016 | 5/11/2016 | 5/11/2016 | P | PART |
Mike Jordan
|
|
|
Please call with questions or access - Nacho Phone #: ###-####. OK to occupy 2nd. floor. Need other trades to final off perm.
|
FIRE-Final Inspection | 5/9/2016 | 5/11/2016 | 5/11/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing all wall changes and include the new occupancy classifications. (Include the enlarged Accounting area and the large A3 area). Route these updated plans for a Fire Life Safety review. It appears that the existing fire alarm system will require modifications for the A3 and B occupancies. Provide verification that additional sprinkler coverage is not required under the new balcony.
|
FIRE-Final Inspection | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled, FIR permit attached to this project is still in issued status. FIR permit needs to be in finaled status before life fire safety inspection can be performed.
|
BLD-Framing/Rough-in | 10/15/2015 | 10/16/2015 | 10/16/2015 | A | PASS |
Mike Jordan
|
|
|
Nacho Phone #: ###-####. New canopy and balcony framing ok. will need engineering for glass guards at balcony. Also advised contractor to submit changes to zoning for approval.
|