Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD14-02705
StatusIssued
Name K2 CONSTRUCTION
Site Address 9599 W FAIRVIEW AVE
Project NameDennis Dillon Auto Renovation
Customer Number 
ePlanReviewYes
Description
(Dennis Dillon Auto Parts Office Renovation) C of O issued under BLD14-01809.Plan Modification 1-15-16 structural and architectural changes to gurad rail. **ajs**Plan modification 3-16-15 Architectural: Revise floor plans, north and east elevations and AP9.1 and AP9.2 patio section and details to incorporate roof structure and concrete pavers to exterior patio. Structural: Redesign detailing for patio structure from foundation to new roof. Revise structural calculations and plans including Sheet S1.1 foundation and framing details and S1.2 structural details. Mechanical: Add a hose bib with backflow preventer for drip irrigation at exterior patio. Add a roof drain to new patio roof. Electrical: Revise exterior lighting at new roof patio to add (4) new can lights. Add heat trace for new patio roof drain.**ajs**Proposed exterior modifications include increasing the size of the existing second floor storefront windows in two offices and a conference room on the north and east elevations; creating a new entry portal to support a new 190 sq ft second floor patio on the north elevation out of the President's Office including foundation; Second Floor interior improvements include modifications to the President's Office, Private Conference Room, Private Toilet Room, a new Break Room and two Offices; New finishes and electrical and mechanical modifications to support the new layouts. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/22/20168/22/20168/23/2016PNR
DetailsMike Jordan
Nacho Phone #: ###-####
BLD-Final5/9/20165/11/20165/11/2016PPART
DetailsMike Jordan
Please call with questions or access - Nacho Phone #: ###-####. OK to occupy 2nd. floor. Need other trades to final off perm.
FIRE-Final Inspection5/9/20165/11/20165/11/2016APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection4/26/20164/27/20164/27/2016AFAIL
DetailsTroy Cobbley
Resubmit plans showing all wall changes and include the new occupancy classifications. (Include the enlarged Accounting area and the large A3 area). Route these updated plans for a Fire Life Safety review. It appears that the existing fire alarm system will require modifications for the A3 and B occupancies. Provide verification that additional sprinkler coverage is not required under the new balcony.
FIRE-Final Inspection4/26/20164/26/20164/26/2016PCANC
DetailsJim Page
Inspection request cancelled, FIR permit attached to this project is still in issued status. FIR permit needs to be in finaled status before life fire safety inspection can be performed.
BLD-Framing/Rough-in10/15/201510/16/201510/16/2015APASS
DetailsMike Jordan
Nacho Phone #: ###-####. New canopy and balcony framing ok. will need engineering for glass guards at balcony. Also advised contractor to submit changes to zoning for approval.