BLD-Final | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-####
|
BLD-Final | 10/3/2016 | 10/4/2016 | 10/4/2016 | A | PART |
Dave Hannah
|
|
|
Inspection requested via web by Jim Carriveau ok for temp occ c/n posted
|
FIRE-Final Inspection | 9/28/2016 | 9/30/2016 | 9/30/2016 | A | PART |
Jim Page
|
|
|
Final for fire life safety cannot be completed until fire sprinkler and fire alarm permits are finaled, both FIR permits still have some work to be completed. Emergency lighting has been tested, fire extinguishers are in place with current inspection tags and door closers have been tested. After the FIR permits are finaled then life fire safety can be finaled.
|
FIRE-Sprinkler Rough-in | 9/13/2016 | 9/14/2016 | 9/14/2016 | A | DONE |
Jim Page
|
|
|
Request was for a life fire safety conference, fire conference complete.
|
BLD-Ceiling Grid Inspection | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Jim Storey
|
|
|
first floor Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Conference | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | PASS |
Jim Storey
|
|
|
Hi Jim, 4th floor ceiling grid, 2 hard lids 1st floor, after 10 if you can Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Conference | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | CANC |
Jim Storey
|
|
|
Hi Jim, looking at hard lid first floor and a couple hand rail questions Phone #: ###-#### Inspection requested via web by Jim Carriveau 1 st floor a3 ceilling ok
|
BLD-Ceiling Grid Inspection | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Jim Storey
|
|
|
2nd ; 3rd floor ceiling grid Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Conference | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Jim Storey
|
|
|
1st floor bathroom cover, i have a meeting from 9:30 to 10:30 for a heads up Phone #: ###-#### Inspection requested via web by Jim Carriveau4th ok 1st ok
|
BLD-Wall cover | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Jim Storey
|
|
|
bathroom ceilings 2 ;3, north stair tower cover, 1st floor cover Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Wall cover | 4/14/2016 | 4/14/2016 | 4/14/2016 | A | PASS |
Jim Storey
|
|
|
3rd flr exterior insulation cover Phone #: ###-#### Inspection requested via web by Jim Carriveau ok to cover all
|
BLD-Wall cover | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Jim Storey
|
|
|
edge of slab assembly 3rd ; 4th floors Inspection requested via web by Jim Carriveau engery code for exterior on 2nd ok to cover.
|
BLD-Wall cover | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | PASS |
Jim Storey
|
|
|
edge of slab assembly for cover, 2nd floor Phone #: ###-#### Inspection requested via web by Jim Carriveau2nd ok 3rd southwest and east ok
|
BLD-Framing/Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | PART |
Jim Storey
|
|
|
Jim my insulator is gun shy with mineral wool install, he would like us to take a look to ensure proper install. I guess he had troubles at city center Inspection requested via web by Jim Carriveau ok to proceed
|
BLD-Framing/Rough-in | 3/21/2016 | 3/21/2016 | 3/21/2016 | A | PASS |
Jim Storey
|
|
|
exterior sofitt framing for cover Inspection requested via web by Jim Carriveau stair encloser ok/ soffits ok to cover
|
BLD-Wall cover | 3/17/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Jim Carriveau fire chalking at shafts ok
|
BLD-Wall cover | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PART |
Jim Storey
|
|
|
Jim, any chance you can catch me right after lunch Inspection requested via web by Jim Carriveau 2nd and third core non rated walls ok to cover.
|
BLD-Wall cover | 2/2/2016 | 2/2/2016 | 2/2/2016 | A | PART |
Jim Storey
|
|
|
Jim, i have a meeting on site from 10 to 10:30 this morning so either side of that would be great if you can Phone #: ###-#### Inspection requested via web by Jim Carriveaushaft core board ok thru out building/ fire stopping pending
|
BLD-Energy code compliance | 1/18/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jim Carriveau sw mech. rm 1st and 2nd ok to cover.
|
BLD-Framing/Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### top of shatfs ok to proceed/ ele boxes back to back two locations/ ele splice box 1 hr ele rm/fireriser rm remove or prorect.
|
BLD-Framing/Rough-in | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### col grout ok exteriot wall framing ok to cover exterior.
|
BLD-Framing/Rough-in | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### grout under col ok to cover.
|
BLD-Framing/Rough-in | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### first floor exterior north ok
|
BLD-Conference | 9/28/2015 | 9/28/2015 | 9/28/2015 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### reviewed fire assemblies curtin wall shaft and stair enclosers
|
BLD-Footing | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Jim Storey
|
|
|
Jim-pour time Phone #: ###-#### placed with si pending reports
|
BLD-Footing | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PASS |
Jim Storey
|
|
|
pour time 9:30AM; Jim Phone #: ###-#### si w/mti
|