Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberBLD14-02741
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 1173 W UNIVERSITY DR
Project NameBSU Alumni and Friends Center
Customer NumberBLD14-02802
ePlanReviewYes
Description
(BSU Alumni and Friends Center) This building is designed as separated use. Plan Modificaiton to revise the exterior precast veneer elements on the facade of the building to brick in varous areas. See approved floor plan for A2 occupant load seating. To change upper roof structure from steel beams and deck to premanufactured metal trusses. Additional steel columns and beams added to exterior to support brick beneer. 3/30/15 **ajs**Project includes outdoor plaza, trash enclosure and parking lot. Permit for the construction of a new 4 story separateduse, fully fire sprinklered building. This permit includes the 4 story structure and all associated site work on the approved drawings. The car shelter is under BLD14-02802 and is a separate structure. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/18/201610/18/201610/18/2016PPASS
DetailsJim Storey
Jim Phone #: ###-####
BLD-Final10/3/201610/4/201610/4/2016APART
DetailsDave Hannah
Inspection requested via web by Jim Carriveau ok for temp occ c/n posted
FIRE-Final Inspection9/28/20169/30/20169/30/2016APART
DetailsJim Page
Final for fire life safety cannot be completed until fire sprinkler and fire alarm permits are finaled, both FIR permits still have some work to be completed. Emergency lighting has been tested, fire extinguishers are in place with current inspection tags and door closers have been tested. After the FIR permits are finaled then life fire safety can be finaled.
FIRE-Sprinkler Rough-in9/13/20169/14/20169/14/2016ADONE
DetailsJim Page
Request was for a life fire safety conference, fire conference complete.
BLD-Ceiling Grid Inspection9/6/20169/7/20169/7/2016APASS
DetailsJim Storey
first floor Phone #: ###-#### Inspection requested via web by Jim Carriveau
BLD-Conference8/1/20168/2/20168/2/2016APASS
DetailsJim Storey
Hi Jim, 4th floor ceiling grid, 2 hard lids 1st floor, after 10 if you can Phone #: ###-#### Inspection requested via web by Jim Carriveau
BLD-Conference7/22/20167/22/20167/22/2016PCANC
DetailsJim Storey
Hi Jim, looking at hard lid first floor and a couple hand rail questions Phone #: ###-#### Inspection requested via web by Jim Carriveau 1 st floor a3 ceilling ok
BLD-Ceiling Grid Inspection6/30/20167/1/20167/1/2016APASS
DetailsJim Storey
2nd ; 3rd floor ceiling grid Phone #: ###-#### Inspection requested via web by Jim Carriveau
BLD-Conference6/13/20166/14/20166/14/2016APASS
DetailsJim Storey
1st floor bathroom cover, i have a meeting from 9:30 to 10:30 for a heads up Phone #: ###-#### Inspection requested via web by Jim Carriveau4th ok 1st ok
BLD-Wall cover5/17/20165/18/20165/18/2016APASS
DetailsJim Storey
bathroom ceilings 2 ;3, north stair tower cover, 1st floor cover Phone #: ###-#### Inspection requested via web by Jim Carriveau
BLD-Wall cover4/14/20164/14/20164/14/2016APASS
DetailsJim Storey
3rd flr exterior insulation cover Phone #: ###-#### Inspection requested via web by Jim Carriveau ok to cover all
BLD-Wall cover4/4/20164/5/20164/5/2016APASS
DetailsJim Storey
edge of slab assembly 3rd ; 4th floors Inspection requested via web by Jim Carriveau engery code for exterior on 2nd ok to cover.
BLD-Wall cover3/31/20164/1/20164/1/2016APASS
DetailsJim Storey
edge of slab assembly for cover, 2nd floor Phone #: ###-#### Inspection requested via web by Jim Carriveau2nd ok 3rd southwest and east ok
BLD-Framing/Rough-in3/28/20163/29/20163/29/2016APART
DetailsJim Storey
Jim my insulator is gun shy with mineral wool install, he would like us to take a look to ensure proper install. I guess he had troubles at city center Inspection requested via web by Jim Carriveau ok to proceed
BLD-Framing/Rough-in3/21/20163/21/20163/21/2016APASS
DetailsJim Storey
exterior sofitt framing for cover Inspection requested via web by Jim Carriveau stair encloser ok/ soffits ok to cover
BLD-Wall cover3/17/20163/17/20163/17/2016APASS
DetailsJim Storey
Inspection requested via web by Jim Carriveau fire chalking at shafts ok
BLD-Wall cover2/9/20162/9/20162/9/2016PPART
DetailsJim Storey
Jim, any chance you can catch me right after lunch Inspection requested via web by Jim Carriveau 2nd and third core non rated walls ok to cover.
BLD-Wall cover2/2/20162/2/20162/2/2016APART
DetailsJim Storey
Jim, i have a meeting on site from 10 to 10:30 this morning so either side of that would be great if you can Phone #: ###-#### Inspection requested via web by Jim Carriveaushaft core board ok thru out building/ fire stopping pending
BLD-Energy code compliance1/18/20161/19/20161/19/2016APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jim Carriveau sw mech. rm 1st and 2nd ok to cover.
BLD-Framing/Rough-in1/5/20161/6/20161/6/2016APASS
DetailsJim Storey
Jim Phone #: ###-#### top of shatfs ok to proceed/ ele boxes back to back two locations/ ele splice box 1 hr ele rm/fireriser rm remove or prorect.
BLD-Framing/Rough-in11/18/201511/19/201511/19/2015APASS
DetailsJim Storey
Jim Phone #: ###-#### col grout ok exteriot wall framing ok to cover exterior.
BLD-Framing/Rough-in10/21/201510/22/201510/22/2015APASS
DetailsJim Storey
Jim Phone #: ###-#### grout under col ok to cover.
BLD-Framing/Rough-in10/20/201510/20/201510/20/2015PPASS
DetailsJim Storey
Jim Phone #: ###-#### first floor exterior north ok
BLD-Conference9/28/20159/28/20159/28/2015PPASS
DetailsJim Storey
Jim Phone #: ###-#### reviewed fire assemblies curtin wall shaft and stair enclosers
BLD-Footing5/27/20155/27/20155/27/2015PPASS
DetailsJim Storey
Jim-pour time Phone #: ###-#### placed with si pending reports
BLD-Footing5/7/20155/8/20155/8/2015APASS
DetailsJim Storey
pour time 9:30AM; Jim Phone #: ###-#### si w/mti