Permit Information
Permit NumberBLD14-02791
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 1109 W MAIN ST Unit: 400
Project NameRed Sky Suite 400
Customer Number 
ePlanReviewYes
Description
(RED SKY - 4TH STORY - HISTORIC OWYHEE PLACE) Fire sprinkler system used for story, height, and area increase. To create a 2,796 square foot office tenant space on the 4th story of the historic portion of the Owyhee Place Building. Work is to include interior nonbearing walls, suspended acoustical ceilings, suspended gypsum board ceilings, interior side-hinged swinging doors, interior sliding doors, interior windows, millwork, and finishes. To construct a non-rated corridor to connect the stairway enclosures serving the 4th story so that all occupants will have access to 2 exits from the 4th story after leaving their tenant space without passing through a stairway enclosure. Work is to include interior nonbearing walls, handrails to serve existing steps, suspended acoustical ceilings, suspended gypsum board ceilings, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/15/201412/16/201412/16/2014APASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Final11/18/201411/19/201411/19/2014APART
DetailsDave Hannah
Dual Phone #: ###-#### ok for temp occ
FIRE-Final Inspection11/18/201411/19/201411/19/2014APASS
DetailsForrest France
Verified corrections. Fire life safety passed. Remainder of project finishes to be completed prior to structural final approval.
FIRE-Final Inspection11/17/201411/18/201411/18/2014PNR
DetailsForrest France
Missing stamped plans and review notes, doors at several locations are not yet installed, relocation of exit sign needed, project finishes underway.
BLD-Ceiling Grid Inspection11/17/201411/17/201411/18/2014PPASS
DetailsDave Hannah
Duel- Phone #: ###-####
BLD-Final11/17/201411/18/201411/18/2014PCANC
DetailsDave Hannah
DUAL Phone #: ###-####
FIRE-Conference11/14/201411/14/201411/14/2014ADONE
DetailsForrest France
Regarding project schedule, related trade work, unfinished work at the SW corridor.
BLD-Conference11/7/201411/7/201411/7/2014PDONE
DetailsDave Hannah
Duel Phone #: ###-####
BLD-Framing/Rough-in10/16/201410/17/201410/17/2014APASS
DetailsDave Hannah
Trey Phone #: ###-####
BLD-Conference10/15/201410/16/201410/17/2014PPEND
DetailsDave Hannah
Chris Phone #: ###-#### needs to pick up permit
BLD-Conference10/8/201410/8/201410/8/2014PPART
DetailsDave Hannah
Chris Phone #: ###-#### ok to one side walls