BLD-Final | 5/29/2015 | 6/1/2015 | 6/1/2015 | P | PASS |
Dave Hannah
|
|
|
Dusty Phone #: ###-####
|
BLD-Final | 5/28/2015 | 5/29/2015 | 5/29/2015 | P | DEFR |
Jim Storey
|
|
|
Dusty Phone #: ###-#### to monday pending mis permit insp. by mech.
|
FIRE-Final Inspection | 5/28/2015 | 5/29/2015 | 5/29/2015 | A | PASS |
Jim Page
|
|
|
Life safety passed, Suite Letter needs to be changed to Suite 102 number prior to final building inspection.
|
FIRE-Conference | 3/20/2015 | 3/20/2015 | 3/31/2015 | P | DONE |
Forrest France
|
|
|
Project related fire sprinkler permit work finaled. Need to repair door closure at the brewery room west side. Informed tenant to provide a permanent power source to attic fans above the kitchen coolers- extension cords not allowed.
|
BLD-Aging Inspection | 2/2/2015 | 2/2/2015 | 2/3/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/1/2014 | 12/1/2014 | 12/9/2014 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | PART |
Dave Hannah
|
|
|
Rick Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | PART |
Forrest France
|
|
|
Approved for temporary occupancy per conditions of the upgrade agreement on file. Need to post max occupancy signage at 99 near the main entry/exit per plan key note, repair one EM light at the east wall dining area.
|